► TPM ACTIVITY ROADMAP OF PLANT
Plant Target Setting: 1. Customer Expectation: No. Parameter Bench Mark Target FY FY Q1 Q2 Q3 Q4 1 Supply with Zero Customer Complaints 2 On time Delivery 100% 3 Zero Field Failures 4 Reduce New Product Development Lead Time 5 Vertical Ramp with Zero Customer Complaint Zero In House Rejection
2
► TPM ACTIVITY ROADMAP OF PLANT
Plant Target Setting: 2. Plant or Company Target Area Parameter Bench Mark Target FY FY Q1 Q2 Q3 Q4 P OEE 85% Production/Hour 10% up Output/Man/Shift Breakdown Time Q Customer Complaints In house Rejection Zero defect from BOP C Variable Manufacturing Cost 5% Down YOY Cost Loss Elimination Cost Reduction Cost of Poor Quality
3
► TPM ACTIVITY ROADMAP OF PLANT
Plant Target Setting: 2. Plant or Company Target Area Parameter Bench Mark Target FY FY Q1 Q2 Q3 Q4 D Delivery Adherence 100% WIP Reduction Supply through FG Inventory Mfg. Lead time Reduction Dev. Lead time Reduction S Major Accident Minor Accident Occupational Health Hazards Environment Pollution due to Process Green Area Improvement 35%
4
► TPM ACTIVITY ROADMAP OF PLANT
Plant Target Setting: 2. Plant or Company Target Area Parameter Bench Mark Target FY FY Q1 Q2 Q3 Q4 M Kaizen by all Employee: Cell Members Supervisors Staffs Managers 2 Kaizen / Man / Month Management by System: Internal Audit Internal Review Mechanism Manpower Skill Enhancement Need base training to all Team Members Daily Work Management for: Plant Head
5
► TPM ACTIVITY ROADMAP OF PLANT
Target linking to : Cell Level : Target driven activity at cell level by PQCDSM way. Pillar Level : Plant Target linked to Pillar chairman with respect to Roadmap of Activities Support Function Team: Plant Target linked to support function: Purchase Store Dispatch PPC Finance HR
6
► TPM ACTIVITY ROADMAP OF PLANT
Plant Head’s Review Calendar No. Review Time Month: W1 W2 W3 W4 I Cell Level Performance: Target Driven Activity PQCDSM way Improvement 1 Hr. (1 Cell/Week) Cell 1 Cell2 Cell 3 Cell 4 II Pillar Activities: As per Pillar Roadmap (2 Pillar/Week) QM KK JH PM DM OTPM SHE E&T III System Control: Quality System Safety System Development System Tier Vendor Audit System 0.5 Hr. (1 Topic /Week)
7
► TPM ACTIVITY ROADMAP OF PLANT
Pillar Activity Roadmap 1. KK – Kobetsu Kaizen Area Parameter FY FY Q2 Q3 Q4 Q1 P OEE 16 Loss Monitoring Corr. Actions & Kaizens M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 Production/Hour Debottlenecking of bottle neck operation by cycle time study Output/Man Study Line Organization Loss Motion loss monitoring Kaizens on it C Cost Reduction Cost loss Monitoring & Corr. Actions with Kaizens Mfg. Variable cost reduction Kaizen D Mfg. Lead Time Reduction Kaizen
8
► TPM ACTIVITY ROADMAP OF PLANT
Pillar Activity Roadmap 2. QM – Quality Maintenance Area Parameter FY FY Q2 Q3 Q4 Q1 Q Customer Complaints: Streamline Final Inspection Activities M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 In House Rejection: Defect Monitoring and corr. Actions QA Matrix Corr. Actions on Happen & May Happen Def. 4M1T Control (IPO) for Sustenance Critical to Quality Points linkage to : TFM/Pro. Quality/Mate. Handling Internal Quality Audit System: Product Audit - 3 Level Inspection - Layout Inspection Process Audit Material Handling Audit
9
► TPM ACTIVITY ROADMAP OF PLANT
Pillar Activity Roadmap 3. JH – Jishu Hozen Parameter FY FY Q2 Q3 Q4 Q1 JH STEP - 0 1S 2S Activity Know Your Machine Know Safety Prepare For JH M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 JH STEP - 1 Cleaning with Meaning Cleaning for Inspection Inspection for Abnormalities Finding (CLIRt) Hard to access Source of Contamination Abnormality tagging by putting Red & White Tag JH STEP - 2 Removal of Red & White Tag related Ab. Hard Access made easy Corr. Action on source of contamination
10
► TPM ACTIVITY ROADMAP OF PLANT
Pillar Activity Roadmap 3. JH – Jishu Hozen Parameter FY FY Q2 Q3 Q4 Q1 JH STEP - 3 Prepare Tentative Standards for CLIRt Visuals on Machine for CLIRt Self Audit Kaizens on Abnormalities JH Kaizen to reduce JH Time Activity M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 Benefit of JH Activity: Zero Breakdown due to weak JH Zero Accident due to weak JH Zero Defect due to weak JH
11
► TPM ACTIVITY ROADMAP OF PLANT
Pillar Activity Roadmap 4. PM – Preventive Maintenance Area Parameter FY FY Q2 Q3 Q4 Q1 P Achieve Zero Breakdown & Sustain Why why Analysis of each Breakdown Update in System (JH/PM/TBM ) Horizontal Deployment M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 Support to JH JH training to Cell Member Support for removal of Abnormalities Support for JH Kaizens PM Activity PM Schedule & Corr. Action on PM Ab. TBM Schedule & Study replaced parts for improve Life improvement TFM Schedule & Corr. Action on Ab. C Maintenance Cost Reduction MTTR Kaizen MTBF Kaizens
12
► TPM ACTIVITY ROADMAP OF PLANT
Pillar Activity Roadmap 5. SHE – Safety, Health & Environment Area Parameter FY FY Q2 Q3 Q4 Q1 S Safety Awareness training Repeated Safety Training Safety Audits Corr. Actions on unsafe condition Capturing near miss incident M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 H Occupational Health Hazards due to Process Study ergonomic conditions & actions Working ambience Health Check up E Pollution Control due to Process Protecting of Air / Land / Water pollution Monitoring MPCB Norms & improvements Preservation of Natural Resources Energy (Water/Power) Saving Prevention of Plastic / Thermo Cole use Green Area Improvement
13
► TPM ACTIVITY ROADMAP OF PLANT
Pillar Activity Roadmap 6. DM – Development Management Parameter FY FY Q2 Q3 Q4 Q1 MP System: New is much better Past Learning Kaizens MP Sheet Library Design Guidelines /Standards/ Checklist to ensure on time use of MP sheets M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 New Product/ Equipment/ Process Development: Development Lead time Reduction First time OK Sample Productionise process with Zero Defects Vertical Ramp with Zero IHR from day 1st
14
► TPM ACTIVITY ROADMAP OF PLANT
Pillar Activity Roadmap 7. E&T – Education & Training Parameter FY FY Q2 Q3 Q4 Q1 JH STEP 4 Training : Know why manual Training Centre 5 Axis training Training Schedule M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 Need Base Training: New / Old Production Cell Member Maint. Member Supervisor Staff
15
► TPM ACTIVITY ROADMAP OF PLANT
Pillar Activity Roadmap 8. OTPM – Office TPM Parameter FY FY Q2 Q3 Q4 Q1 Support Function: Identify Support Function: Purchase / Store / Dispatch / PPC / HR / Finance Support to Production Shops Identify Loss from Mfg. side & Office side Corr. Actions and Kaizen on it Own Office improvements M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 Tier II Vendor Improvements: Zero Quality defect 100% Delivery on time
16
TPM JOURNEY CONTINUES…
► THANK YOU…! TPM JOURNEY CONTINUES…