3 What the TSIs mean…  The on-board system is tightly defined – it has to be able to go anywhere,  The trackside allows flexibility,  If features are not required on a route or in a location, why provide them?  Think of a Chinese menu!

4 On-board set meal & the trackside ETCS menu  On-board is tightly defined Like a set menu. No choices, you just get it!  Few choices the owner can make, but cannot change the core.  There are loopholes allowing seemingly robust rules to be interpreted differently!  The trackside gives you the full menu, with every option you can think of.  We have to choose the right combinations of dish to deliver the operations we need.  The dishes will be made to order so they will be expensive.  If we can choose a sub-set of dishes and buy in bulk, it will be more consistent for signaller, driver and engineers, and be cheaper.

5 Building blocks 5 TSIs, SRS, etc. Reference Design Applications We need to select and assemble these blocks into a series of facilities from which we can build a railway. The TSI (Technical Standard for Operability) mandates a series of (SRS) System Requirements Specifications. The SRS define the communication between the trackside and the train – they are the building blocks.

6 The Reference Design Concept  How do we define which building blocks we need and what they look like?  Understanding how the railway needs to work,  Breaking the journey of a train into small units,  Each unit is a facility – defined and documented,  The railway can be built from a sequence of facilities.

7  Train starts in depot (start of mission process),  Train enters ETCS area (N1) in Level 1,  Train transitions to Level 2 (N1),  MA is extended (A1) several times,  Train approaches occupied terminal platform (H1) and transitions to OS mode,  Driver brings train to a stand and closes cab (C),  Coupling takes place in SB (I), Typical journey 7  Driver enters cab and undertakes start of mission,  Train obtains first movement authority (G2 or G3 followed by A2),  Train Dispatch takes place (D),  MA is extended (A1) several times,  Train approaches critical routing point and routing information is provided (A3),  Train is stopped on approach to junction (E),  MA is extended (A1).

8 Mapping Facilities

9  Our current processes rely on:  the scheme plan conveying a lot of information  the designers understanding the operational requirements.  No longer constrained by aspect sequences and signal spacing.  Scheme plan will focus on hazards to be protected and the operational outputs needed.  Block section lengths can vary to provide capacity and reduce junction occupation times. Developing a scheme 9

10 Scheme Design – Level 1 Launch L1 Launch can be used for short space transitions Offers single-section L1 MA past the entry signal into ETCS area Trains can connect to L2 later in the transition process

11 What matters is what the driver sees  At start of mission,  During the journey,  Entering an occupied platform,  Transitioning  We need to design what the driver is offered and when they are offered it – this may not be linked to physical things.

12 Many ways of Start of Mission 12 On Sight? Full Supervision? Track-Ahead-Free? Route setting – avoiding driver alerts When do we offer On-Sight?

13 All about the communications  GSM-R is the backbone,  Built for voice but ETCS needs data,  The base option - use a voice channel for the data  Better option is to use Packet Switch (GPRS) permitting 3 or 4 data calls over one channel.  FTN needs an upgrade for either solution. GSM-R

14 ERTMS trackside equipment Beacon AxleCounter Unit FT Network Point Machine Point Machine Level Crossing Beacon AxleCounter Unit Beacon Track Circuit/ Object Controller Train RBC Point Machine Point Machine Level Crossing Beacon Track Circuit/ Counter Unit Trackside Interlocking Detection Central Control Traffic GSM R

15 Lineside Signage

16 On Track Equipment Axle Counters replace track circuits Clamp-lock points Euro-Balise. (French for beacon)

17 Infrastructure changes  Signals disappear and new signs introduced  Block section lengths can vary  Different type of maintenance required  Scheme design will focus on the hazards to be protected and the operational outputs needed  Design plans will convey very different information – symbols and terminology  Operational aspirations needs to be integrated at the design stage

18 18 Infrastructure Maintenance  TSR no longer have trackside signs  Maintenance activities will change  Telecoms (GSM-R) now key part of signalling system.  Possession rules change  Fitting ETCS to OTM.  New kit in ROCs.

19 Handheld possession terminals 19

20  Full ERTMS. Movements in OS or FS.  Level NTC – movement authority received from lineside signal or Shunter’s hand signals.  Level 1 launch at outlet Yards and Depots 20

21 Overlay – a special case 21  ERTMS gives the greatest benefits when you start with a blank sheet  Substituting an in-cab MA for a lineside signals gives little advantage on its own  Understanding “pure” ERTMS rules in overlay  Conflicting information!  Driver behaviour/ workload  Transitions are challenging.

22 But hang on, it is interoperable!  Remember the Chinese menu! We have many things we can do, but which do we need?  Suppliers have only implemented what they have been asked  It may seem like a “pick-and-mix”, but…  We need to take account of the international rule book; the requirements of the other TSIs, etc.  It has to be demonstrably safer and better than today!

23  We don’t yet have all the answers!  We are working with the industry to agree the best solutions,  Once again we are leading the field – many of the questions we are asking have not been asked before!  Our European colleagues are facing many of the same challenges and we are working together to understand potential solutions,  Train despatch, level crossing management, braking models, degraded working, start of mission, heritage vehicles, management of misrouting are all topics in the pot! Challenges ahead 23

24 Questions?


Download ppt "Infrastructure Part 3. Signalling 2 What the TSIs mean…  The on-board system is tightly defined – it has to be able to go anywhere,  The trackside."

Similar presentations


Ads by Google