Business Development Workshop Series Presents: Keep it Flowing ! Presenters: Jasvir Grewal, P.E./ Rizwan Siddiqi, PE Water Systems Engineering Department Agenda Services and Clients Major Projects Future Outlook Business Development Workshop Purpose & Goals We all play a role in developing EBA’s business. Hence, we need to understand what EBA does, who are our clients and how EBA employees can contribute to marketing EBA and overall business development WSE Senior Managers: Mitch Harris, PE ; Richard Davis, PE Rich Shagogue, PE; Dick Berich, PE Marty Soma, PE ; John Tabak, PE Joseph Danquah, PE; Artie Polk Jasvir Grewal, PE; Ana Evangelista
2
Water Systems Engineering Department Started In 2005 In 2006, Water and Wastewater Department moved to Laurel, MD 50+ Staff, 30 in office & rest field staff and on client site In 2011, name changed from “Water and Wastewater” to “Water Systems” More than 50% of our work is as Prime Consultant
3
Water Systems Services Catch All Statement: Water Systems (Study, Design, and Construction Administration) Services Include: Infrastructure/Utility Design Pumping Stations & Force Mains Treatment Plant Design & Upgrades Field Inspection Services (MH, Pipelines) Constructability Review/Value Engineering Program/Project Management Services
4
Water Systems Clients Anne Arundel County Baltimore County City of Baltimore Carroll County DC Water NASA/Goddard Space Flight Center, MD St. Mary’s County State of Maryland - DGS WSSC Other Consultants
5
Infrastructure/Utility Design
6
Infrastructure -Water and Sewer Pipeline Multiple On-call and BOA type Contracts Multiple Utility Agency Experience 40 Miles of Water Main Design and Permitting 60 Miles of Sewer Main Designs and Permitting Size Range From 4 inch to 120 inch Both Gravity and Pressure Systems
7
Infrastructure-Water and Sewer Pipeline Sewer Evaluation: CCTV Inspections Over 15 PACP/MACP Certified Staff NASSCO Certified PACP/MACP Trainer Evaluated 100+ miles of Gravity Sewer Evaluated 10+ miles of Forcemain (Desktop and Field) Sewer Trenchless Rehab Methods: Cured-in-place pipeline (CIPP) Pipe Bursting Grouting Point Repair Horizontal directional drilling (HDD) Micro tunneling Jack & bore Open-cut/Conventional
8
Infrastructure -Water and Sewer Pipeline Water Transmissions Same Trench and Relocation Design Emergency Driven Schedules PRV and Meter Vault Assessment and Design Valve & Fire Hydrant Exercising Program Hydraulic Modeling and Model Update
9
Infrastructure -Wastewater Collection Systems New and Rehabilitation of Existing Systems Condition Assessment of Exist Pipelines and MHs Consent Decree Driven Schedules Open Cut and Trenchless Sewer Rehab MH Evaluation and Rehab Design Permits
10
Hydraulic Modeling (H&H) WSSC- WaterGEMS Unlimited Node Model Hydraulic Analysis & Modeling Develop, Calibrate and Validate Model Assess Existing Capacity Estimate Future Flow Conditions Evaluate Ability to Transmit Peak Flows Calculate Hydraulic Grade Line Baltimore City – WaterGEMS Model Constructed City Data Model Scenarios for Cost Allocation between Baltimore City and County
11
WSSC Water and Sewer Rehabilitation BOA Contract No. PM0003A07 12 Task orders: Replacement of 16.2 miles of 3, 6, 8, 10 inch water mains Capacity analysis, surveying, geotechnical, utility designations, test pits, cost estimating, environmental permitting, community outreach Challenges: Time sensitive schedules Bypass design Environmental permits $2.0M BOA Contract for 2 Years - Expired 2010 $4.0M BOA Contract for 3 Years - Expires 2013
12
WSSC Water and Sewer Rehabilitation BOA Contract No. PM0006A07 18 Task orders: Relocation, Rehab/Replacement of Sanitary Sewers to Correct Overflows New Sewer Design Rehab– Manhole Grouting & Lining CIPP Lining Pipe Bursting Point Repairs Permitting ( MDE, SHA, MN-CPPC, DNR, Montgomery and Prince George’s Counties and other Municipality permits) $1.5M Base Contract $2.0M Option Year 1 Contract Renewal
13
Urgent Needs Wastewater Engineering Services Project 1042E City of Baltimore Rehab, Repair, Replacement of Sanitary Sewers 13 Task Orders Onsite Support Services Correction of Stream Erosion Around Manholes Eliminate Basement Sewer Backups Design of New Sewer Systems Services Surveying Geotechnical Investigations Utility Designations and Test Pits Permitting MOT Community Outreach
14
Pumping Stations and Force Mains
15
Pumping Stations & Force Mains Design and Rehab of Pumping Stations Rehabilitation and Upgrade Replacement of Pumps Code Upgrade Designs Installation of Bypass System Capacity Upgrade Six SPS Upgrade in AACO Design of Force Mains 2 Miles of 36” FM for Baltimore City (Dundalk & Quad Ave) Creek Road SPS, Anne Arundel County, Maryland
16
Challenges: Maintenance of Traffic Utility Investigations ROW/Easements Phasing Plan Agency Coordination Odor Control Septic System Upgrade Pocomoke River State Park Study, Design and Construction 4 Miles of Low Pressure FM 14 New Grinder Pumps Offline Sewage Storage Facility 3.5 Miles of Force main using HDD Pumping Station design $3.2 M Construction Cost Presented Project at Tri-Association Conference 2011
17
Sanitary Pumping Station Upgrade Anne Arundel County Design/Upgrades of Six Existing SPS Pump Replacement Electrical and Control System Upgrades Temporary and Emergency Bypass Pumping New Valve Vaults Site Utility and Drainage Ventilation System Cathodic Protection Construction Administration Services
18
Under An On-Call Pumping Station Design Services Baltimore County Constructability Review Construction Cost for SPS Improvements Provided services for 7 Pumping Stations Design Capacity - 0.5 MGD to 3.5 MGD
19
Treatment Plant Design and Upgrades
20
Treatment Plant Upgrades Constructability Review/Value Engineering Study, Planning, Design Construction Administration As-Built Drawings O&M Manuals Montebello Water Filtration Plant; City of Baltimore, Maryland Marlay Taylor Water Reclamation Facility Design of Headworks St. Mary’s County Metropolitan Commission, Maryland
21
Treatment Facilities Wastewater Treatment Facilities ENR Upgrades Upgrade and Rehab of Existing Systems Design based on Consent Decree Requirements Permitting Water Treatment Facilities Process Design and Upgrades Condition Assessment and Capacity Evaluation Filter Repair and Replacement Pilot Testing
22
Montebello WFP– Filter Repairs City of Baltimore Preparation of Emergency Design Package to Rehabilitate Seven Sand Filters Bid & Construction Inspection and Management Services 7 out of 60 Filters out of service for one year Obsolete Old Clay Tiles Keep Plant in Service during Construction Scope: Moving Target due to unknowns conditions Schedule: Eight months Budget: $1.8 M, not to exceed $2.0 24/7 Schedule: 12-15 hours Shifts Zero Accidents EBA met the schedule and budget (Presented Project at Tri- Association Conference 2012
23
Marlay Taylor Water Reclamation Facility ENR Upgrades, METCOM, St. Mary’s County Process Mechanical Design of New Headworks Facility Design Capacity : 24 MGD Site/Civil, Geotechnical, Surveying New Headworks Facility- Fine Screens, Grit Removal Equipment Conveyors Coordinate Headworks Design with Architectural, Structural, MEP & HVAC Upgrade Storm Water Pollution Prevention Plan under NPDES
24
Constructability Review/Value Engineering Services Montebello Filtration Improvements Montebello Plant 2 Finished Water Reservoir Cover Patapsco WWTP Nitrification Filters Back River WWTP ENR Upgrade Stoney Run Wastewater PS and Force Main
25
Field Services CCTV inspections for sewer mains Locating and opening manholes Manhole location survey using GPS & inspections Large diameter sewer pipeline inspections Confined space services Valve and fire hydrant exercising services Water and sewer main corrosion testing and inspections Filed inspections of water and sewer systems
26
Future Outlook Current Backlog – 1 to 2 years Projected Growth for next 3 to 5 Years – 20% Staff & Workload Expanding Client Base to VA and PA