Presentation is loading. Please wait.

Presentation is loading. Please wait.

Ruth Pordes, March 2010 OSG Update – GDB May 12 th 2010 Operations Services 1 Periodic reliability problems with end to end publishing to WLCG BDII – as.

Similar presentations


Presentation on theme: "Ruth Pordes, March 2010 OSG Update – GDB May 12 th 2010 Operations Services 1 Periodic reliability problems with end to end publishing to WLCG BDII – as."— Presentation transcript:

1 Ruth Pordes, March 2010 OSG Update – GDB May 12 th 2010 Operations Services 1 Periodic reliability problems with end to end publishing to WLCG BDII – as we knew the whole system is fragile e.g. add a CE and LDIF is too large for WLCG BDII; Skip one publish and information not available. OSG provides ATLAS and CMS an SLA – will the WLCG also have an SLA please? We use CEMON – continuing to investigate server hangs; when server cannot connect to collector must timeout an then retry later. Web-service based ticket exchange to BNL/US-ATLAS in production. Developing equivalent interface with Fermilab/US CMS Tier-1

2 Ruth Pordes, March 2010 Tier-3 Support OSG is planning to do a trial run of a centralized PAKITI server to inform T3 sites of potential security problems that require patching. This service can also be made available to Atlas for T3 sites that accept PANDA jobs. The access separation between site admins was implemented by EGEE/WLCG. We are grateful for the help. The official release will be this Friday. One of the hot items right now is creating an auto-configure tool for Xrootd in the VDT. Requirements now being defined from Atlas. One key requirement is the need for a non-root install. This will allow their s/w distribution tools to automatically deploy & configure xrootd on Atlas T3s. https://twiki.grid.iu.edu/bin/view/Tier3/XrootdInstallAlt https://twiki.grid.iu.edu/bin/view/Tier3/XrootdInstallAlt Working with Atlas and CMS in designing training modules for upcoming T3 sessions. Possible modules include security, CE/SE installation, GUMS installation, and a session on T3 design and configuration for those deploying new T3s. 2

3 Ruth Pordes, March 2010 Security Activities Set up the testbed for new IGTF CA layout. Our very initial tests (only a week of testing) do not indicate a major break. we will send an official report once we learn more. Auditing that can ultimately trace back to the user when VOs use portals to access OSG. When new CILOGON service is available will start testing ID management from Shib on the Campus. 3

4 Ruth Pordes, March 2010 Storage and Data Management Addressing problem tickets with dCache, BestMan (new release) and xROOTD. Preparing for OSG support for Chimera. Doing preparatory work at/with CMS for the DM workshop in June. More effort to provide storage (~1TB) per site for several non-physics applications, and look into a VO solution for data management that is not the specific HEP ones. Provided initial archiving tool for NEES – earthquake engineering. 4

5 Ruth Pordes, March 2010 US CMS – OSG news GLEXEC Deployment OK: US_FNAL BR_SPRACE US_Caltech US_Nebraska US_MIT US_Purdue US_UCSD Fail: US_Florida US_Wisconsin 5 In support of Tier-3s established a central phedex server at FNAL. Starting work on CMS on the Cloud - EC2 and Magellan.


Download ppt "Ruth Pordes, March 2010 OSG Update – GDB May 12 th 2010 Operations Services 1 Periodic reliability problems with end to end publishing to WLCG BDII – as."

Similar presentations


Ads by Google