Download presentation
Presentation is loading. Please wait.
Published byEverett Summers Modified over 8 years ago
1
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 1/52) AB-CO Measurement & Analysis Present status of the individual systems analysis applications B Khomenko, E Michel, B Pannetier, A Raimondo, H Reymond, A Rijllart 1.Introduction 2.Automatic analysis for the HWC 3.Manual analysis for experts 4.Status of the applications 5.Conclusions
2
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 2/52) AB-CO Measurement & Analysis 1. Introduction
3
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 3/52) AB-CO Measurement & Analysis 1. Introduction Three main clients are already involved with the PM analysis: - AT-MEL for the surface & tunnel HWC of the Quench Protection Systems - AB-CO-MI for the HWC of the Power Interlock Systems - AB-PO for the HWC of the Power Converters installed in the LHC
4
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 4/52) AB-CO Measurement & Analysis 1. Introduction Following several periodical meetings and specifications related to the SACEC and GLOBAL ANALYSIS, 2 types of tools have been developed by our section: - Automated analysis tools used via the Sequencer for the HWC - Dedicated applications for the experts (based on the same analysis)
5
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 5/52) AB-CO Measurement & Analysis 2. Automatic analysis for the HWC
6
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 6/52) AB-CO Measurement & Analysis 2. Automatic analysis for the HWC In the framework of the Hardware Commissioning, a test manager application has been developed (AB/CO-AP): the SEQUENCER - It gives the possibility to set & execute sequence of steps - Each sequence consists of a set of instructions - The instructions allow status read & real actions on the QPS, PIC & PC systems in the LHC tunnel
7
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 7/52) AB-CO Measurement & Analysis 2.1 Architecture of the systems
8
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 8/52) AB-CO Measurement & Analysis 2.2 Sequence of a test When a test is launched by the SEQUENCER: - Instructions & parameters are sent on the equipments according to the test (short circuit, interlock, powering to nominal) - Test data are sent to the PM Automatic Analysis (localization, test type, circuit name…) - When PM files are available, they are read from the PM server, and analysis are started - Then status (OK / FAILED) is returned by the PMAA to the Sequencer - According to the result, the next step will be executed or not
9
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 9/52) AB-CO Measurement & Analysis 2.3 Draft panel of the PM Automatic Analysis Circuit Name Step Name Result of the analysis
10
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 10/52) AB-CO Measurement & Analysis 2.4 Sequence of the PM Automatic Analysis From the PMAA side: - A loader is waiting for the PM files on the PM server, according to the test data (circuit name…) - When a PM file is available, the specific analysis is executed and the result is returned to the Sequencer - When the results from the 3 analysis are generated: IF all is OK, a new test can be launched ELSE manual analysis should be done by an expert
11
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 11/52) AB-CO Measurement & Analysis 2.5 Actual status of the Sequencer - The software developed for the Sequencer is going to be integrated in the LHC-SEQUENCER (general sequencer for LHC physics & hardware) - The “old” Sequencer application will still be used for the long test (i.e. Dry Run) - PIC1, PIC2 tests will be managed via the LHC-SEQUENCER Should be available mid February/March Interaction with PMAA must be redesigned
12
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 12/52) AB-CO Measurement & Analysis 2.5 Actual status of the Sequencer LHC-SEQUENCER CMW PM analysis Test data Test data Analysis results Analysis results
13
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 13/52) AB-CO Measurement & Analysis 2.5 Actual status of the Sequencer - In case of problems at the beginning, oral communication between 2 operators is still foreseen LHC SEQUENCER PM ANALYSIS
14
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 14/52) AB-CO Measurement & Analysis 3. Manual analysis for experts
15
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 15/52) AB-CO Measurement & Analysis 3.1 QPS Expert Analysis
16
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 16/52) AB-CO Measurement & Analysis 3.1 QPS Expert Analysis
17
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 17/52) AB-CO Measurement & Analysis 3.1 QPS Expert Analysis
18
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 18/52) AB-CO Measurement & Analysis 3.1 QPS Expert Analysis
19
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 19/52) AB-CO Measurement & Analysis 3.1 QPS Expert Analysis
20
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 20/52) AB-CO Measurement & Analysis 3.1 QPS Expert Analysis
21
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 21/52) AB-CO Measurement & Analysis 3.1 QPS Expert Analysis QPS data Post Mortem Server
22
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 22/52) AB-CO Measurement & Analysis 3.1 QPS Expert Analysis The QPS expert application can be used: - Magnet protection systems validation during reception phase - HWC of the systems installed in the tunnel
23
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 23/52) AB-CO Measurement & Analysis 3.2 PIC Expert Analysis
24
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 24/52) AB-CO Measurement & Analysis 3.2 PIC Expert Analysis Automatic pattern analysis (i.e. Powering Failure, Discharge) Time selection & Display of 3 events
25
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 25/52) AB-CO Measurement & Analysis 3.2 PIC Expert Analysis Logging LHC Ref DB PIC data Tunnel areas PIC systems Circuits
26
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 26/52) AB-CO Measurement & Analysis 3.2 PIC Expert Analysis The PIC expert application has been used during Dry Run in UA83 The automatic pattern recognition will be useful for the offline analysis during HWC in sector 7-8
27
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 27/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis
28
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 28/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis
29
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 29/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis
30
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 30/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis
31
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 31/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis
32
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 32/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis
33
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 33/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis
34
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 34/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis
35
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 35/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis
36
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 36/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis
37
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 37/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis
38
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 38/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis
39
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 39/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis
40
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 40/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis
41
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 41/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis
42
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 42/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis 1 Hz buffer
43
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 43/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis 1 KHz buffer
44
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 44/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis 1 KHz buffer 50 Hz buffer
45
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 45/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis
46
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 46/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis
47
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 47/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis LHC Ref DB PC data Tunnel areas Converters types Powering sub circuit Post Mortem Server
48
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 48/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis The PC expert application is used for the HWC of the Power Converters
49
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 49/52) AB-CO Measurement & Analysis 4. Status of the applications
50
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 50/52) AB-CO Measurement & Analysis 4. Status of the applications - The communication method between PMAA & the new LHC- SEQUENCER has to be changed with CMW subscribe - Several parameters are still missing in the AA (i.e. limits, delay between signals, ranges …) - Specific views must be integrated to help experts during HWC (i.e. logical signals for PC, …)
51
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 51/52) AB-CO Measurement & Analysis 5. Conclusions
52
LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 hubert.reymond@cern.ch (slide 52/52) AB-CO Measurement & Analysis 5. Conclusions - Analysis blocs can be easily re-used for new clients - Existing browsing structure can be adapted to new requests - Merge of the browsing or extraction tools for all clients could be possible - We are open to all the specifications
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.