Introduction of the EUSO-BALLOON 9th Progress Meeting Naples, November the 9th, 2012 Guillaume Prévôt, Sylvie Dagoret and Peter von Ballmoos 1 EUSO-BALLOON,

Similar presentations


Presentation on theme: "Introduction of the EUSO-BALLOON 9th Progress Meeting Naples, November the 9th, 2012 Guillaume Prévôt, Sylvie Dagoret and Peter von Ballmoos 1 EUSO-BALLOON,"— Presentation transcript:

1 Introduction of the EUSO-BALLOON 9th Progress Meeting Naples, November the 9th, 2012 Guillaume Prévôt, Sylvie Dagoret and Peter von Ballmoos 1 EUSO-BALLOON, 9th progress Meeting 2012

2 first flight in spring 2014 from Timmins (48°34' N, 81°22' W) CNES campaign starts March 1st 2014 => EUSO BALLOON is to be flight-ready in Timmins by end of february flight scenarios have been elaborated by Jean Evrard for the december flight review => we can make it, but must stay on tight schedule first light / first flight

3

4 Timmins

5 EUSO-BALLOON, 5th progress Meeting 2012 5 Timmins

6 the lenght of the astronomical night at Timmins (48°34' N, 81°22' W)

7 PDM- MAPMT - EC : Front Boards OK, EC-Units OK, Proto M OK - EC ASIC - EC Proto - HVPS 1&2 / SWITCHES : prototypes under test - PDM Board - meca : Top: manuf.. Bottom follows, modif ok except HVPS DP- CPU, CCB, and communication (CLOCK) : OK - HK, tests DP / HK - LVPS and interfaces - S/W CPU : Low level protocol and interfaces, other S/W Architecture- Electrical : "interior"/"exterior", design frozen - Mechanical, design frozen, study on struct. integrity going - Thermal, ongiong, first results Lenses- manufacturing on track AIT/AIV- planning started IRCAM- position on gondola, safety constraints Documents- 1 st versions for dec DR have been read by Pascale EUSO-BALLOON Dashboard 9.11.2012 meet dec DR

8 PDM- MAPMT : Gain measured - EC : Front Boards OK, EC-Units OK, Proto M OK - EC ASIC : brazing process suspected - EC Proto E waiting for Matra - HVPS 1&2 / SWITCHES : prototypes under test - PDM Board under tests in Corea, expected at LAL mid-Nov - meca : Top: manuf.. Bottom follows, modif ok except HVPS DP- CPU, CCB, and communication (CLOCK) : OK - HK, tests DP / HK - LVPS and interfaces - S/W CPU : Low level protocol and interfaces, other S/W ? Architecture- Electrical : "interior"/"exterior", design frozen - Mechanical, design frozen, study on struct. integrity going - Thermal, ongiong, first results Lenses- manufacturing on track AIT/AIV- planning started IRCAM- position on gondola, safety constraints, Documents- very little is written up for the december DR EUSO-BALLOON Dashboard 12.10.2012 meet dec DR

9 PDM- MAPMT - EC : Front Boards OK, EC-Units OK, Proto M OK - EC ASIC - EC Proto - HVPS 1&2 / SWITCHES : prototypes under test - PDM Board - meca : Top: manuf.. Bottom follows, modif ok except HVPS DP- CPU, CCB, and communication (CLOCK) : OK - HK, tests DP / HK - LVPS and interfaces - S/W CPU : Low level protocol and interfaces, other S/W Architecture- Electrical : "interior"/"exterior", design frozen - Mechanical, design frozen, study on struct. integrity going - Thermal, ongiong, first results Lenses- manufacturing on track AIT/AIV- planning started IRCAM- position on gondola, safety constraints Documents- 1 st versions for dec DR have been read by Pascale EUSO-BALLOON Dashboard 9.11.2012 meet dec DR

10 Since the last progress meeting APC Paris, October the 12th The electrical prototype has been received by LAL (before potting) EC ASIC card has been sucessfully tested (before data transmission tests) We fixed the design of PWP The delivery of 19 missing MAPMTs + UV filters on going (december 2012) Cockroft Walton and switches prototypes have been tested at APC (and a bit modified to be adapted to MAPMTs) PDM board delay : 6 PCBs produced and partially tested, delivery at LAL is scheduled for end of November, we are trying now to organize EC- ASIC/PDM Board communication tests DP tests are undergoing in Naples Thermal analysis has been done The documentation is well-advanced (architecture documents, Technical specification for CPU software, PAIE, updates of Phase A documents, ICD, etc.) 10 EUSO-BALLOON, 9th progress Meeting 2012

11 Since the last progress meeting (2) PWP design defined See Hector Prieto’s presentation Ec_ASICs electrical tests has been done See Pierre B.’s presentation CW and switches tests has been done See Ph Goro.’s presentation Writing of the electrical architecture Document See Michel’s presentation Writing of the mechanical architecture Document See Peter’s presentation Thermal architecture analysis (Document on going) See Gustavo’s presentation Tests of HK & LVPS communication Phase A documents actualized See Andrea‘s presentation Writing of the CPU software Document See Francesco’s presentation 11 EUSO-BALLOON, 9th progress Meeting 2012

12 Since the last progress meeting (3) Interfaces Control Document has been defined and commenced See Sylvie’s presentation PAIE Document (about integration) well advanced See Sylvie’s presentation Verification matrix to the technical requirements has been defined See Guillaume’s presentation List of the steering committee’s actions See Guillaume’s presentation 12 EUSO-BALLOON, 9th progress Meeting 2012

13 The work to be done 13 EUSO-BALLOON, 9th progress Meeting 2012 Ending the work on the interfaces and writing the related documentation (mechanics I/F, cables, pinout assignment, etc.) Ending the communication tests Performing the HK / LVPS Boards communication tests before mid-december Performing the CCB / PDM Board communication tests before mid-december Organizing and performing the EC-ASIC / PDM Board communication tests before mid-december Defining the software specifications Testing on the EC electrical prototype before end after potting Writing the last versions of the documents

14 Questions and Problems Expected progresses on PDM board ‘stand alone’ tests Expected progresses on PDM board / Ec-ASIC communication tests Expected progresses on PDM board / CCB communication tests 14 EUSO-BALLOON, 9th progress Meeting 2012

15 The Goal of this meeting Discussing the last programmatic aspects before CDR Review Discussing the expectation of the different documents written for the CDR Review Listing actions 15 EUSO-BALLOON, 9th progress Meeting 2012


Download ppt "Introduction of the EUSO-BALLOON 9th Progress Meeting Naples, November the 9th, 2012 Guillaume Prévôt, Sylvie Dagoret and Peter von Ballmoos 1 EUSO-BALLOON,"