Presentation is loading. Please wait.

Presentation is loading. Please wait.

JCOMM in situ Observations Programme Support Centre 04 March 2016 Argo Status Argo TC, Mathieu Belbéoch.

Similar presentations


Presentation on theme: "JCOMM in situ Observations Programme Support Centre 04 March 2016 Argo Status Argo TC, Mathieu Belbéoch."— Presentation transcript:

1 JCOMM in situ Observations Programme Support Centre 04 March 2016 Argo Status Argo TC, Mathieu Belbéoch

2 JCOMM in situ Observations Programme Support Centre 04 March 2016Outline 1.Overview –Performance Indicators –Network –National Contributions –Coverage 2015 –Network evolution –Survival rate –Data flow status 2.Implementation –National Contributions distribution –National Contributions evolution –Density, Coverage –Age, Age Hot Spots Analysis –Plans 3.Data Flow –Pending floats –Delays by DAC –Timeliness by DAC –Observations –DM/RT status 4.Instrumentation –Models distribution –Models evolution –Models survival –Telecom. Systems distribution –Telecom Systems evolution 5.Operations –Deployments –Ships –Karahoa’s contribution –Publication rate 6.Communication –Design –Maps –Status –News

3 JCOMM in situ Observations Programme Support Centre 04 March 2016 GoodAverageBad Performance Targets TargetsInitialGlobalDeepBio IMPLEMENTATION ActivityNb of active units in the design targets = 3000, 4400, 1000, 900 OperationalityNb operational units vs targets in the design IntensityNb of units deployed (t -365) in the design targets =750, 1100, 250, 225 Coverage (Yearly)Nb of well sampled 3X3 grid element over last year see coverage map Coverage (monthly)Nb of well sampled 3X3 grid element over last month DATA FLOW DeliveryNb of operational vs registered units Quality (TEMP, PSAL)Nb of Profiles flag=‘A’ vs total (last month) DM ProcessingRation DM/DM eligible profiles Timeliness (FR, US)Nb of profiles distributed within 24h (last month) INSTRUMENTATION Reliability (75, 150)Nb of platforms surviving 75 or 150 cycles vs total deployment date [t-750; t-1115] or [t-1500; t-1865]

4 JCOMM in situ Observations Programme Support Centre 04 March 2016 Performance Indicators (%) IndicatorInitialGlobalDeepBio IMPLEMENTATION Activity11390231 Operationality11288230 Intensity10684631 Coverage (Yearly)7055 Coverage (monthly)5443 DATA FLOW Delivery94 Quality (TEMP, PSAL)93, 91 DM Processing69 Timeliness (FR, US)85, 84 INSTRUMENTATION Reliability (75, 150)75, 48 Very goodGoodAverageBad

5 JCOMM in situ Observations Programme Support Centre 04 March 2016Overview

6 JCOMM in situ Observations Programme Support Centre 04 March 2016Overview

7 JCOMM in situ Observations Programme Support Centre 04 March 2016Overview

8 JCOMM in situ Observations Programme Support Centre 04 March 2016Overview

9 JCOMM in situ Observations Programme Support Centre 04 March 2016Overview

10 JCOMM in situ Observations Programme Support Centre 04 March 2016

11 JCOMM in situ Observations Programme Support Centre 04 March 2016Overview Network growth, distinct floats distributing observations at GDACs (monthly)

12 JCOMM in situ Observations Programme Support Centre 04 March 2016Overview Survival Rate by float generation

13 JCOMM in situ Observations Programme Support Centre 04 March 2016Overview Data flow obs (RT/DM): 20 Obs/Day

14 JCOMM in situ Observations Programme Support Centre 04 March 2016Implementation Distribution of operational floats by country

15 JCOMM in situ Observations Programme Support Centre 04 March 2016Implementation Country growth

16 JCOMM in situ Observations Programme Support Centre 04 March 2016Implementation Country growth (zoom/ no US)

17 JCOMM in situ Observations Programme Support Centre 04 March 2016Implementation

18 JCOMM in situ Observations Programme Support Centre 04 March 2016Implementation

19 JCOMM in situ Observations Programme Support Centre 04 March 2016Implementation

20 JCOMM in situ Observations Programme Support Centre 04 March 2016Implementation Age = (Latest Observation date – Deployment date)

21 JCOMM in situ Observations Programme Support Centre 04 March 2016Implementation

22 JCOMM in situ Observations Programme Support Centre 04 March 2016Implementation

23 JCOMM in situ Observations Programme Support Centre 04 March 2016 Plans vs Density/corverage

24 JCOMM in situ Observations Programme Support Centre 04 March 2016 Data Flow Confirm float status (e.g. deployment failure) or enable data distribution

25 JCOMM in situ Observations Programme Support Centre 04 March 2016 Data Flow

26 JCOMM in situ Observations Programme Support Centre 04 March 2016 Data Flow

27 JCOMM in situ Observations Programme Support Centre 04 March 2016 Data Flow GDACs Delays

28 JCOMM in situ Observations Programme Support Centre 04 March 2016 Data Flow Timeliness

29 JCOMM in situ Observations Programme Support Centre 04 March 2016 Data Flow

30 JCOMM in situ Observations Programme Support Centre 04 March 2016 Data Flow

31 JCOMM in situ Observations Programme Support Centre 04 March 2016 Data Flow

32 JCOMM in situ Observations Programme Support Centre 04 March 2016 Data Flow

33 JCOMM in situ Observations Programme Support Centre 04 March 2016 Data Flow as of 01/03/2016

34 JCOMM in situ Observations Programme Support Centre 04 March 2016Instrumentation

35 JCOMM in situ Observations Programme Support Centre 04 March 2016Instrumentation Models evolution

36 JCOMM in situ Observations Programme Support Centre 04 March 2016Instrumentation Models evolution (zoom – no APEX)

37 JCOMM in situ Observations Programme Support Centre 04 March 2016Instrumentation Survival chart model

38 JCOMM in situ Observations Programme Support Centre 04 March 2016Instrumentation Distribution

39 JCOMM in situ Observations Programme Support Centre 04 March 2016Instrumentation Sensors

40 JCOMM in situ Observations Programme Support Centre 04 March 2016Instrumentation Telecommunication Types (55% Argos, 45% Iridium)

41 JCOMM in situ Observations Programme Support Centre 04 March 2016Instrumentation Telecommunication Types Evolution

42 JCOMM in situ Observations Programme Support Centre 04 March 2016Operations

43 JCOMM in situ Observations Programme Support Centre 04 March 2016Operations

44 JCOMM in situ Observations Programme Support Centre 04 March 2016Operations

45 JCOMM in situ Observations Programme Support Centre 04 March 2016Operations

46 JCOMM in situ Observations Programme Support Centre 04 March 2016Communication

47 JCOMM in situ Observations Programme Support Centre 04 March 2016Communication

48 JCOMM in situ Observations Programme Support Centre 04 March 2016Communication

49 JCOMM in situ Observations Programme Support Centre 04 March 2016Communication

50 JCOMM in situ Observations Programme Support Centre 04 March 2016Operations Publication rate

51 JCOMM in situ Observations Programme Support Centre 04 March 2016Communication Maps http://argo.jcommops.org/maps ftp://ftp.jcommops.org/Argo/maps/LATEST/ JCOMMOPS Ocean Observing Systems Status ftp://ftp.jcommops.org/Argo/Doc/2016-03-AIC.pdf ftp://ftp.jcommops.org/Argo/Doc/2016-03-AIC.xlsx News http://www.twitter.com/jcommops


Download ppt "JCOMM in situ Observations Programme Support Centre 04 March 2016 Argo Status Argo TC, Mathieu Belbéoch."

Similar presentations


Ads by Google