Peter-Raymond KettleMEG Fortnightly Meeting 16/5/20071 Beam Schedule Update
2
Peter-Raymond KettleMEG Fortnightly Meeting 16/5/20072 Beam Schedule Update Beam Line + TC-associated: End -Beam Commissioning 3/5 SU-Tests 7/5 BTS Warm-up 8/5 – 20-5 Remove BTS + Beam Line 21/5 – 25/5 Remove DS EC + Dc Rail System 21/5 - 25/5 Remove US EC + N 2 -Bag + Clean N 2 -Seal 29/5 – 31-5 + Clean N 2 -Seal 29/5 – 31-5 Install New US N 2 -Bag + US EC + Tests 1/6 - 17/6 + US EC + Tests 1/6 - 17/6 Install US TC 18/6 -25/6 Install Concrete Shielding Wall Kottmann et al. 27/6 DC Installation 25/6 – 6/7 Install New DS N 2 -Bag + DS TC 7/7 – 22/7 Install DS EC + Insertion System IS 23/7 -29/7 COBRA Gas Tests 2/8 -12/8 Beam Line + TC-associated: End -Beam Commissioning 3/5 SU-Tests 7/5 BTS Warm-up 8/5 – 20-5 Remove BTS + Beam Line 21/5 – 25/5 Remove DS EC + Dc Rail System 21/5 - 25/5 Remove US EC + N 2 -Bag + Clean N 2 -Seal 29/5 – 31-5 + Clean N 2 -Seal 29/5 – 31-5 Install New US N 2 -Bag + US EC + Tests 1/6 - 17/6 + US EC + Tests 1/6 - 17/6 Install US TC 18/6 -25/6 Install Concrete Shielding Wall Kottmann et al. 27/6 DC Installation 25/6 – 6/7 Install New DS N 2 -Bag + DS TC 7/7 – 22/7 Install DS EC + Insertion System IS 23/7 -29/7 COBRA Gas Tests 2/8 -12/8
3
Peter-Raymond KettleMEG Fortnightly Meeting 16/5/20073 Beam Schedule Update cont. C-W + Beam Line: Arrival C-W 15-16/5 Installation + finish Infrastructure Area 21/5 – 15/6 Arrival Beam Line Elements 21/5 – 25/5 Beam Line Set-Up + Testing (without/with COBRA) 21/5 – 17/6 Remove C-W Beam Line (DC-Install) 18/6 – 24/6 Install C-W Beam Line post Detector installation 2/8 - 12/8 Detector installation 2/8 - 12/8 C-W + Beam line Full Test + Calo. Calib. 12/8 ~ 9/9 C-W + Beam Line: Arrival C-W 15-16/5 Installation + finish Infrastructure Area 21/5 – 15/6 Arrival Beam Line Elements 21/5 – 25/5 Beam Line Set-Up + Testing (without/with COBRA) 21/5 – 17/6 Remove C-W Beam Line (DC-Install) 18/6 – 24/6 Install C-W Beam Line post Detector installation 2/8 - 12/8 Detector installation 2/8 - 12/8 C-W + Beam line Full Test + Calo. Calib. 12/8 ~ 9/9
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.