PORT OF TACOMA
2
Agreement Lincoln Avenue Grade Separation – Utility Relocation Request authorization for the Executive Director to Execute an Agreement with Burlington Northern Santa Fe Railway Company (BNSF), Contract No. 068051, for work associated with the Lincoln Avenue Grade Separation – Utility Relocation, Project No. E2702.
3
PORT OF TACOMA The bridge design calls for replacement of five railroad crossings, four owned by BNSF. BNSF requires all rail work on their tracks be accomplished with their contractors. Background Lincoln Avenue Grade Separation – Utility Relocation
4
PORT OF TACOMA Railroad Lines at Project Site Lincoln Avenue Milwaukee Way Marc Street Marc Avenue Thorne Road Lincoln Avenue Loop BNSF Crossings East 19 th Street
5
PORT OF TACOMA The scope of work includes: Demolition of existing crossings Installation of base course material Installation of pre-cast concrete panels and rail Temporary removal and reinstallation of rail sections for utility installations Provide miscellaneous materials necessary Scope of Work Lincoln Avenue Grade Separation – Utility Relocation
6
PORT OF TACOMA The estimated cost for these services is $337,000. Work is on a time & materials basis. The 2007 and 2008 – 12 Program Budget, Planned Category, Intermodal Line of Business, FAST Corridor Phase II Program, allocates $4,971,000 for this project. Contract Costs Lincoln Avenue Grade Separation – Utility Relocation
7
PORT OF TACOMA Request authorization for the Executive Director to Execute an Agreement with Burlington Northern Santa Fe Railway Company, Contract No. 068051, in an amount of $337,000, for work associated with Lincoln Avenue Grade Separation – Utility Relocation, Project No. E2702. Conclusion Lincoln Avenue Grade Separation – Utility Relocation