Validator TM and Validator-NT TM Product Training
2
© 2008 JDSU. All rights reserved.JDSU CONFIDENTIAL & PROPRIETARY INFORMATION2 What does the Validator do? Performs basic to advanced tests on network, telco, and coax cabling –Wiremap: opens, shorts, split pairs, miswires, reversals –Distance to opens and shorts Speed Certifies Ethernet cabling up to Gigabit speeds –Bit Error Rate Test –Delay Skew –Signal to Noise Ratio Allows for planning and documenting the job with included Plan-Um software –Network layout –Test schedule –Test results
3
© 2008 JDSU. All rights reserved.JDSU CONFIDENTIAL & PROPRIETARY INFORMATION3 What does the Validator-NT do? Everything that the Validator does PLUS active network tests: –Port discovery up to gigabit Ethernet –IP Ping –Cisco Discovery Protocol
4
© 2008 JDSU. All rights reserved.JDSU CONFIDENTIAL & PROPRIETARY INFORMATION4 Cabling Tests Wiremap Distance to opens and shorts
5
© 2008 JDSU. All rights reserved.JDSU CONFIDENTIAL & PROPRIETARY INFORMATION5 Ethernet Speed Certification Skew, SNR, BERT
6
© 2008 JDSU. All rights reserved.JDSU CONFIDENTIAL & PROPRIETARY INFORMATION6 Planning and Documenting the Job
7
© 2008 JDSU. All rights reserved.JDSU CONFIDENTIAL & PROPRIETARY INFORMATION7 Active Network Tests Port Discovery Cisco Discovery Protocol (Not Shown) Ping
8
© 2008 JDSU. All rights reserved.JDSU CONFIDENTIAL & PROPRIETARY INFORMATION8 Hub Flash
9
Using the Validator
10
© 2008 JDSU. All rights reserved.JDSU CONFIDENTIAL & PROPRIETARY INFORMATION10 Some Basic Information – Cable Types Common cable types and their pass/fail criteria are pre-defined and cannot be edited Custom cable types can be created
11
© 2008 JDSU. All rights reserved.JDSU CONFIDENTIAL & PROPRIETARY INFORMATION11 Steps to a Successful Job 1.Plan the Job 2.Perform Tests 3.Document
12
© 2008 JDSU. All rights reserved.JDSU CONFIDENTIAL & PROPRIETARY INFORMATION12 Plan the Job Use Plan-Um to plan the job –Job Information –Cable Test Schedule Load the job onto the Validator
13
© 2008 JDSU. All rights reserved.JDSU CONFIDENTIAL & PROPRIETARY INFORMATION13 Job Information
14
© 2008 JDSU. All rights reserved.JDSU CONFIDENTIAL & PROPRIETARY INFORMATION14 Cable Test Schedule
15
© 2008 JDSU. All rights reserved.JDSU CONFIDENTIAL & PROPRIETARY INFORMATION15 Load the Cable Test Schedule onto the Validator Connect the Validator to a free USB port on your PC OR remove the CF card from the Validator and insert it into a card reader on your PC NOTE: Validator must be turned off when card is removed or when USB cable is connected The CF card will appear as a drive on the PC Copy the job file to the CF card or simply “save as” and navigate to the CF card to save the file directly to the CF card from Plan-Um
16
© 2008 JDSU. All rights reserved.JDSU CONFIDENTIAL & PROPRIETARY INFORMATION16 Perform Tests Power on the Validator and Launch Auto Test (use arrow keys to highlight and then press SEL) Select Job Utilities and then select Open to open the job file Use the arrow keys to highlight the job file you wish to load and then press the F1 key (Open) The job file will be loaded and you will be returned to the main screen with Auto Test highlighted Press SEL Cable Test Schedule will be highlighted Press SEL to launch
17
© 2008 JDSU. All rights reserved.JDSU CONFIDENTIAL & PROPRIETARY INFORMATION17 Cable List The Cable List will be shown Highlight the cable to be tested using the up and down arrows Connect the remote to the far end of the cable to be tested Connect the main unit to the local end of the cable to be tested Press the Test button
18
© 2008 JDSU. All rights reserved.JDSU CONFIDENTIAL & PROPRIETARY INFORMATION18 Test Results Once the auto tests have completed, the Validator will show a Pass or Fail result Continue through the Cable List until all cables have been tested
19
© 2008 JDSU. All rights reserved.JDSU CONFIDENTIAL & PROPRIETARY INFORMATION19 Document Transfer job file back to PC and open with Plan-Um Print individual results or full report
20
Advanced and Active Network Tests
21
© 2008 JDSU. All rights reserved.JDSU CONFIDENTIAL & PROPRIETARY INFORMATION21 Hub Flash Hub Flash sends an intermittent link signal to flash the link status light on Ethernet equipment.
22
© 2008 JDSU. All rights reserved.JDSU CONFIDENTIAL & PROPRIETARY INFORMATION22 Port Discovery Identifies telephone or network devices connected to the other end of the jack or cable. Validator-NT reports on existing services or Ethernet link with advertised speed.
23
© 2008 JDSU. All rights reserved.JDSU CONFIDENTIAL & PROPRIETARY INFORMATION23 Ping Verifies connectivity to resources on or off the network and the IP addresses. Validator-NT can simultaneously Ping up to seven different IP addresses and can be run in DHCP or static modes.