1 USTileCal Planning Meeting @ UTA ITC Scintillator Project R. Miller May 13, 2002 1 E3 C10 B11 E1 D5 A14 - A15 B14 D6 A16 - - D4 A12 A13 B12 - B13 - - - - B15 - 1.0 1.1 1.2 1.4 1.6 ITC Scintillator Project

2 USTileCal Planning Meeting @ UTA ITC Scintillator Project R. Miller May 13, 2002 2 Responsibilities MSU –Produce ITC fiber assemblies for EB instrumentation - 99% completed –Design, construct and test prototypes of crack (E3, E4) scintillators - completed –Purchase scintillator (E1:E4) –Purchase & Prepare WLS fibers (E1:E4) –Assemble, test & install crack scintillators - purchase and assembly of mechanical components pending submission approval of drawings UTA –Design, construct and test prototype of gap (E1, E2, C10) scintillators - in progress –Assemble, test & install gap scintillators

3 USTileCal Planning Meeting @ UTA ITC Scintillator Project R. Miller May 13, 2002 3 Gap Scintillator Design

4 USTileCal Planning Meeting @ UTA ITC Scintillator Project R. Miller May 13, 2002 4 Crack Scintillator Design

5 USTileCal Planning Meeting @ UTA ITC Scintillator Project R. Miller May 13, 2002 5 Optical Paths

6 USTileCal Planning Meeting @ UTA ITC Scintillator Project R. Miller May 13, 2002 6 Envelope

7 USTileCal Planning Meeting @ UTA ITC Scintillator Project R. Miller May 13, 2002 7 Mounting Proposal

8 USTileCal Planning Meeting @ UTA ITC Scintillator Project R. Miller May 13, 2002 8 Special Mounting

9 USTileCal Planning Meeting @ UTA ITC Scintillator Project R. Miller May 13, 2002 9 Issues & Status Funding/production status –Funding (USATLAS) OK’d for gap scintillators –Funding OK’d for crack scintillator mechanical components - Production delayed pending TC approval of drawings Special Modules –Fiber assemblies for modules with special ITC submodules is almost completed (except for 1 special module type) –Prototype mounting brackets have been made for modules with modified inner R - attached after EB assembly - allows us to use standard scintillators on all modules - one didn’t fit Light Covers –Plastic film to cover fiber cables, connectors - detailed design in progress

10 USTileCal Planning Meeting @ UTA ITC Scintillator Project R. Miller May 13, 2002 10 Further testing –More Test Beam signal levels ? –Cs Scans - signal levels ? –Radiation hardness tests ? –Check mounting & light covers on EB pre- assembly Issues & Status (cont.)


Download ppt "USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, 2002 1 E3 C10 B11 E1 D5 A14 - A15 B14 D6 A16 - - D4 A12 A13 B12 - B13 - - -"

Similar presentations


Ads by Google