Presentation is loading. Please wait.

Presentation is loading. Please wait.

1Proprietary and Confidential GERAN WG3 #70 Meeting Report - Plenary Presentation – GP-160348.

Similar presentations


Presentation on theme: "1Proprietary and Confidential GERAN WG3 #70 Meeting Report - Plenary Presentation – GP-160348."— Presentation transcript:

1 1Proprietary and Confidential GERAN WG3 #70 Meeting Report - Plenary Presentation – GP-160348

2 2Proprietary and Confidential Participation  X companies/organisations took part in this F2F Meeting  XX CRs were agreed.  Agreed CRs pre Spec  Agreed CRs for the last 3 meetings per meeting 4 LS were received during this meeting, 1 reply LS was sent. General Information – GERAN WG3 Numbers

3 3Proprietary and Confidential For the first time in GERAN History, no maintenance CR was received Work Progress – Maintenance

4 4Proprietary and Confidential GP-151148 New Work Item on Extended DRX (eDRX) for GSM – MS conformance testing part GP-151148 – Final version of Work Plan – GP-160422GP-160 – TS 51.010 Default condition section amended with eDRX/PEO – 1 TC on PEO Reduced Monitoring removed following TS 45.008 essential corrections – 1 TC on PEO Reduced Monitoring updated following TS 45.008 essential corrections – 10 new TCs covering reselection, paging, NAS, mixing with PSM and Extended UL were added. – Overall Completion: 100 %- Completed GP-151186 New Work Item on UE Power Consumptions Optimizations (UEPCOP) - MS conformance testing part GP-151186 – Final version of Work Plan – GP-160423GP-160 – 5 NAS TC were added (and one « PSM/eDRX » paging TC in eDRX Work Plan) – Overall Completion: 100 % - Completed Work Progress – Active Wis1/2

5 5Proprietary and Confidential GP-15xxxx New Work Item on Extended Coverage GSM (EC-GSM) for support of Cellular Internet of Things – MS conformance testing part GP-15 – Initial version of Work Plan – GP-160228GP-160 – Analysis of the requirement up to GERAN #69 completed, XX TCs identified (RF, selection/reselection, RLC, MAC, no NAS) – XX TCs and most of the EC default testing configuration drafted. – Overall Completion: 40 % - Target Completion RAN5#72 (August) Work Progress – Active Wis2/2

6 6Proprietary and Confidential Follow up to the ETSI LS received in Anaheim (GERAN#68, GP-151065 LS on the transposition of HS for GSM MS under the RE-D from ETSI MSG) :  the GERAN WG3 delegation was made aware that the EN 301-511 was updated, and is under approbation, to comply with the new EU RE-D Directive. GSM receiver requirements were added. Others

7 7Proprietary and Confidential Incoming (3) – GP-160227 LS on Test Case Optimisation - optimising LTE Inter-RAT protocol (GCF CAG) GP- – GP-160236 LS on Test Case Optimisation - optimising of extreme testing - 2G (GCF CAG) GP-1 – GP-160379 LS on Test Case Optimisation - optimising of extreme testing - 3G (GCF CAG) GP-1 – GP-160357 LS on Clarification of GERAN3/RAN5 Test Cases and Timelines for LPWA IoT Solutions (MIoT GSMA) GP-1 Outgoing (1) – GP-160381 Reply LS on Clarification of GERAN3/RAN5 Test Cases and Timelines for LPWA IoT Solutions Liaison Statements

8 8Proprietary and Confidential Next meetings MeetingDatesLocation RAN WG5 #7222 – 26 August 2016Gothenburg, Sweden

9 9Proprietary and Confidential The King (GERAN3) is dead, long live the King (RAN5) !


Download ppt "1Proprietary and Confidential GERAN WG3 #70 Meeting Report - Plenary Presentation – GP-160348."

Similar presentations


Ads by Google