1 Harrisburg Overpass Construction Update July 7, 2015

2 Safety On site meeting with HFD Fire House 20, June 23 rd 2015

3 -Discuss emergency access route -Coordination of equipment through jobsite -Future meetings to improve emergency plans

4

5

6 On site meeting with HFD Fire House 18, June 23 rd 2015

7 Traffic Control

8 -Traffic control in place -Looking East on Harrisburg Blvd.

9 -Traffic control in place -Public sidewalks protected -Looking East on Harrisburg

10 -METRO’s Bus stop at 66 th St. -Bus access defined by metal barriers

11 Utilities Construction - Installation of Storm Water Pipe in front of Value Village

12 - Pipe storage yard at 66 th and Harrisburg

13 -Tree protection and silt fence on North East Quadrant near Union Pacific Railroad tracks

14 Traffic Control Traffic moved to middle of Harrisburg (1 lane each way) Access from Harrisburg: Side streets maintain access Some weekend and night intersection closures for utility work Advanced coordination with property owners for new driveway construction Phase 1 – May 2015 to November 2015 Construction Activities New waterlines, storm sewers, sanitary sewers New private driveways, curbs New sidewalks New landscape New roadways Union Pacific NE SESW NW

15 North East Quadrant Hendrick Grain Co. Storage Yard Value Village 65 th ST. 66 th ST. 9 Cesar Chavez Blvd. Storm Sewer Water Line Bridge Bents Popeye’s, Gas Station, Washateria Tornado Bus Co. Vacant Lot 8 10 7 65 Sanitary Line Union Pacific 65 th ST. 66 th ST. Hughes ST. Cesar Chavez Blvd.

16 South East Quadrant 65 th ST. 66 th ST. Cesar Chavez Blvd. Jorge’s Car and Truck #2 Vacant Lot Texas Belting Storm Sewer Water Line Bridge Bents Pegasso Bus Tours Marbella Banquet Hall Chonchino Auto Sales Guanajuato Barber Shop #2 Taqueria Tierra Caliente Family Dollar Store Office (Vacant) 10 9 8 7 6 5 Storm Sewer Bridge Bents Sanitary Line Union Pacific Cesar Chavez Blvd. 65 th ST. 66 th ST. Hughes ST.

17 North West Quadrant Dorsey Dental Lot and House Field Office Vacant Lot Abandoned Strip Mall Linwood St. Caylor St. Storm Sewer Water Line Bridge Bents Warehouse Demolition Vacant Lot Ware- House 5 6 4 3 2 1 Union Pacific Caylor St. Barziza St. Cowling St.

18 South West Quadrant Linwood St. Caylor St. Key Station #93 Houston Armature Storm Sewer Water Line Bridge Bents C&R Auto Sales Gameroom Warehouse METRO’s Yard Houston Armature (Vacant Lot) 1 2 3 4 5 6 Union Pacific Caylor St. Barziza St. Cowling St.