Download presentation
Presentation is loading. Please wait.
Published byBarrie Nichols Modified over 8 years ago
1
Power Management Control System Cost Allocation Module g Cost Allocation Module (CAM) Energy Charge Customer Charge Fuel Rate Demand Charge
2
Power Management Control System Cost Allocation Module g Cost Allocation Monitor demand and usage
3
Power Management Control System Cost Allocation Module g Cost Allocation Decrease your utility bill
4
Power Management Control System Cost Allocation Module g Cost Allocation Establish cost savings
5
Power Management Control System Cost Allocation Module g CAM Device Network Physical Meters -synchronized with Utility Meter Virtual Meters -math. combinations of Physical Devices Cost Centers - groups of Physical/Virtual Devices Usage Data is read from devices through DDE server. Retrieve Usage Info and Store in Open DB Data recovery possible if device has recorder (I.e., PQM) Ability to correct / insert missing intervals is possible PMCS Open SQL Datab ase Data is normalized and stored in Open Database. “Energy Profiler” by Energy Interactive for Graphics, Analysis& Billing Colorful Load Profile and Graphics Detailed reports for bill estimation “What If” Scenarios possible Supports Real Time Pricing Rates Wizard (create own) Data is exported to Energy Profiler.
6
Power Management Control System Cost Allocation Module g CAM Logger Device Polling Data normalization and DB storage Missing Data Retrieval Device Validation Utility Dmd/Time Synchronization Open SQL Database DDE Server Energy Interactive’s “Energy Profiler” Rate Comparison Software *.csv ODBC Connections CAM Editor Facility/Utility Server Physcial Meters Virtual Meters Cost Centers Scheduling CAM Viewer Tabular Data Load Profile Energy Profiler™ Export Utility View Tabular Data View Data Profile Edit Intervals Export data to *. csv files Host Architecture Device Communication Network
7
Power Management Control System Cost Allocation Module g “What If” Scenarios ? ? ? ? ? ? Real Time Pricing
8
Power Management Control System Cost Allocation Module g “What If” Scenarios ? ? ? ? ? ? Migrate loads to off-peak periods
9
Power Management Control System Cost Allocation Module g “What If” Scenarios ? ? ? ? ? ? Load shifting
10
Power Management Control System Cost Allocation Module g “What If” Scenarios ? ? ? ? ? ? Supplier comparison
11
Power Management Control System Cost Allocation Module g Real Time Pricing
12
Power Management Control System Cost Allocation Module g Peak Avoidance
13
Power Management Control System Cost Allocation Module g 30 min. Before Load Shifting After Load Shifting Load Shifting 30 min.
14
Power Management Control System Cost Allocation Module g States with Deregulation ME MT NV NH OK CA PA RI
15
Power Management Control System Cost Allocation Module g Choose Most Cost Effective Power Provider Rate Comparisons
16
Power Management Control System Cost Allocation Module g Device Network Retrieve Usage Info and Store in Open DB “Energy Profiler” by Energy Interactive for Graphics, Analysis& Billing Contents of CAM PMCS Open SQL Datab ase
17
Power Management Control System Cost Allocation Module g CAM Editor CAM Logger CAM Viewer Energy Profiler™
18
Power Management Control System Cost Allocation Module g Power Management Control System Version 5.1b or higher System Requirements
19
Power Management Control System Cost Allocation Module g LV, MV Switchgear Switchboards, MCC panelboards 3710/3720 PQM Cost Allocation Module Supported Devices 73 00 SR 750MVT PM Trip Units
20
Power Management Control System Cost Allocation Module g Supported Devices DeviceFirmware Rev. Supported POWER LEADER EPM (commet communications option)1.06 (Modbus communications option)2.0/3.3 EPM 3710 Electronic Power Meter3.01.1-B EPM 3720 Electronic Power MeterV05B1502 EPM 7300 Electronic Power Meter1.33 MULTILIN Power Quality Meter (PQM)3.13 for data logging3.13A MULTILIN SR750 feeder 2.10 management relay Enhanced MicroVersa Trip trip units for4.13 Power Break PB11, AKR, and Wave Pro breakers
21
Power Management Control System Cost Allocation Module g Computer Requirements Minimum Requirements Pentium processor, 133 MHz Microsoft Windows NT 4.0 Workstation 64 megabytes of RAM 512K cache 2-gigabyte hard disk VGA or Super VGA video adapter and monitor CD-ROM drive and 3.5” floppy disk drive Recommended Requirements Pentium II processor, 300 MHz Microsoft Windows NT 4.0 Workstation 96 megabytes of RAM 512K cache 2-gigabyte hard disk VGA or Super VGA video adapter and monitor CD-ROM drive and 3.5” floppy disk drive
22
Power Management Control System Cost Allocation Module g DescriptionCatalog NumberList Price GO-104A Cost Allocation Module PLPMCSCAMEP$4,000.00 Software Package Cost Allocation Module View Node PLPMCSCAMVIEW$ 350.00 Software Cost Allocation Module View Node PLPMCSEPVIEW$2,850.00 Software with Energy Profiler Pricing
23
Power Management Control System Cost Allocation Module g Availability? Immediately!
24
Power Management Control System Cost Allocation Module g
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.