2016 WECC Schedulers Meeting
2
Wholesale Power for 44 Member Rural Electric Cooperatives ◦ 1.5M Members ~2800MW Peaking load ◦ Across Five States Wind, Hydro, Solar, Gas and Coal Portfolio ◦ Owned, Joint Owned and PPAs ◦ Over 4300 MW 7 Network Transmission Providers ◦ 3 non-jurisdictional/4 jurisdictional ◦ Excludes Full Requirements Load in SPP
3
FERC Order 890 ◦ Formalizes Designation and Undesignation Process ◦ Pro forma tariff Section 30 Network Resources Section 31 Network Load Transmission Providers (TP) ◦ Develop Business Practices and Manual Processes FERC Order 676H ◦ NAESB WEQ Version 3 Standards Mandatory NITS on OASIS Software Platform
4
Remedy Undue Discrimination - pro Forma Tariff Qualifications as a Designated Network Resource (DNR) Rules for Termination ◦ Third Party sales ◦ Off System vs On System ◦ Reserves ◦ Hazard/Backup Power Direction to NAESB ◦ Develop Standards for NITS transactions on OASIS Intent - Visibility ◦ Prevent Overdesignation of DNRs ◦ Prevent Oversubscription of Transmission Service
5
Reflect Policy Determinations in FERC Order 890 series NAESB Wholesale Electric Quadrant (WEQ) ◦ Version 3 Standards for Business Practices and Communication Protocols Mandatory Enforceable Requirements
6
WEQ-001 ◦ Process Description ◦ Disaggregation and Aggregation of Loads ◦ Timing Requirements WEQ-002 ◦ Template data WEQ-003 ◦ Definitions of Data Elements WEQ-013 ◦ Definitions around Statuses and Workflow
7
September 2014 ◦ WEQ Standards revised-Order 676H ◦ 18 month implementation –April 2016 July 2015 – Notice of Plan from TPs September 2015 – OATI Conference November 2015 – TPs First Glimpse January 2016 ◦ TPs Business Practice updates ◦ TPs require template data February 2016 – TP Training at OATI Late February 2016 – TPs File for Extension March 17, 2016 – Extension Granted
8
June 24, 2016 ◦ Compliance Filing date ◦ Posting and Documenting of NITS Arrangements July 25, 2016 ◦ Full compliance Implementation
9
Updates to webTrans Updates to E tag 1.8.2 SmartOASIS – Transactions>NITS ◦ Request Summary or Application Summary
10
Application ◦ Starting Source for all Components ◦ Attestation ◦ Customer ◦ Agent - Optional
11
Select TP and Application Ref Select from drop down or click asterisk Load ◦ Load Area ◦ POR ◦ Sink, Load voltage and substation optional ◦ Forecast Method Ancillary Services ◦ By POD ◦ By Service Type
12
Select TP and Application Ref Generators ◦ Unit characteristic data ◦ Eligible MW Resources ◦ PPAs & Owned Generation ◦ Ability to Group Gen ◦ Forecasted MW Designated Network Resource ◦ Resource/POR combo ◦ Designated MW ◦ Attestation
13
Terminating DNRs ◦ Temporary and Indefinite ◦ Select TP, Application Ref and DNR ◦ MW Entries are Negative Modifications/Additions ◦ Load, Generators, Ancillaries, Resources, DNRs Procuring 6-NN (Secondary Network transmission)
14
Load Forecast Data – Seasonal Generation Dispatch – Economics Resource Forecast – Seasonal Auxiliary Transmission – Coordinated Request Scheduling Rights – Access from DNR *Optionality is determined by TP
15
Avoid Special Characters and Spaces Time Out Issues in Google Chrome Status of: ◦ Queued with Preconfirmed not Checked OR ◦ PreSubmittal Edit Icon available in Upper Right ◦ Status of Deficient or PreSubmittal Right Click in Grey Area – Check Box for Optional displays
16
Termination display - Lacking 24 hour profile button Network Secondary – Lacking 24 hour profile button No link between ATC and Network Secondary Unable to Change POR on DNR Time Zone issues in multiple displays POR duplication of DNR entries WebTrans – Scheduling Rights
17
OATI -Webinars for Network Customers OATI - Recorded Versions Available at: ◦ SmartOASIS>Help (?)> Transactions>NITS CAUTION: Tells you how the software works but NOT what your TP expectations are
18
Requirements and Guidance on NITS Entry Optional Functionality – Inclusion/Exclusion ◦ 10 Year L&R ◦ Scheduling Rights E tag 1.8.2 ◦ NITS Resource Field and NITS MISC Field
19
Template Submission to TPs ◦ Upon Request ◦ Upon Revision Production Entry ◦ Who Network Customer or TP ◦ How Manual Entry CSV file load issue ◦ When Prior to June 24, 2016
20
Original Templates sent to all 7 TP prior to January deadline Production entry of base data with 2 TPs ◦ 1 Pursuing scheduling right option Remaining 5 TPs ◦ Completing Template Review and Revision by end of May/early June ◦ Requesting Entry Instructions – when/where Planning on line Temporary Terminations per deadline and/or TP directions
21
10 Year Load & Resource Submittals Scheduling Rights Usability/Feasibility of Termination Usability/Feasibility of Network Secondary E tag 1.8.2 fields Alarms/Checks by TPs – Tag vs NITS
23
Carman Ruder Power Scheduler II Tri-State Generation and Transmission Association, Inc. 303-254-3372 cruder@tristategt.org Lisa Tiffin Backcasting and Topology Manager Tri-State Generation and Transmission Association, Inc. 303-254-3865 ltiffin@tristategt.org