High School Presentation to LAUSD's Career Technology Education Advisory Council
2
Agenda Define remaining Phase II, III, and IV High School Projects Opportunities and challenges of Flexible Classrooms Real Estate Constraints Budget and Program restraints Discuss specific HS projects Need to understand CTEAC facility goals.
3
High Schools
4
High School locations
5
1,300sf Flexible Classrooms
6
SRHS# 13 Local District: 7 Seats: 2,025 Small Learning Communities: 4 Vertical SLC's, 2 per building Site Area: 17.45 ac Building Area: 227,000sf Floor Levels: 4 floors Flex Classrooms: On 4 th floor, 1 per SLC Design Status: 50% Construction Documentation
7
SRHS# 13
12
SRHS# 12 Local District: 7 Seats: 2,025 Small Learning Communities: 4 separate building SLC's Site Area: 14.3 ac Building Area: 221,437sf Floor Levels: 4 floors Flex Classrooms: On 3 rd floor, 1 per SLC Design Status: 100% Construction Documentation
13
SRHS# 12
17
SRHS# 3 Local District: 7 Seats: 2,025 Small Learning Communities: 4 Vertical SLC's, 1 building, 2 SLC's in each leg of 'L' shape Site Area: 15.26 ac Building Area: 225,000sf Floor Levels: 4 floors Flex Classrooms: On 3rd floor, 1 per SLC Design Status: 100% Construction Documentation
18
SRHS# 3
22
SRHS# 7 Local District: 6 Seats: 1,620 Small Learning Communities: 3 Horizontal SLC's, 1 building Site Area: 13.98 ac Building Area: 179,869sf Floor Levels: 3 floors Flex Classrooms: 1 on each floor, 1 per SLC Design Status: DSA Back Check
23
SRHS# 7
26
CRHS# 16 Local District: 5 Seats: 2,025 Small Learning Communities: 4 Vertical SLC's, 2 per building Site Area: 13.20 ac Building Area: 207,000sf Floor Levels: 3 floors Flex Classrooms: On 2nd floor, 1 per SLC Design Status: 100% Construction Documentation
27
CRHS# 16
31
VRHS# 8 Conversion of an existing MS to a HS Local District: 2 Seats: 1,620 Small Learning Communities: 3 SLC's Site Area: 17.45 ac Building Area: 90,000sf Floor Levels: 1 floor Flex Classrooms: None Design Status: DSA approved
32
VRHS# 8 Existing Byrd Middle School Site
33
VRHS# 8
34
New Science Court
35
Questions? Presented by: Vincent Coffeen Director, Design Management, LAUSD Vincent.coffeen@lausd.net