Presentation is loading. Please wait.

Presentation is loading. Please wait.

Vasilisa Lenivenko Vladimir Palichik (LHEP, JINR ) Alushta, June 2016.

Similar presentations


Presentation on theme: "Vasilisa Lenivenko Vladimir Palichik (LHEP, JINR ) Alushta, June 2016."— Presentation transcript:

1 Vasilisa Lenivenko Vladimir Palichik (LHEP, JINR ) Alushta, June 2016

2 Physics possibilities at the Nuclotron Physics possibilities at the Nuclotron AGS NA49BRAHMS In A+A collisions at Nuclotron energies: In A+A collisions at Nuclotron energies:  Strange and multi-strange hyperon production at threshold Au+Au/Pb+Pb, central Nuclotron energies  Production of hypernuclei through coalescence of Λ with light fragments enhanced at high baryon densities BM@N  The BM@N energy range is well suited for the search of hypernuclei 2

3 BM@N setup DCHmRPC-2 GEM Central tracker (GEM) inside analyzing magnet to reconstruct AA interactions Outer tracker (DCH, Straw) behind magnet to link central tracks to ToF detectors ToF system based on mRPC chambers and T0 detectors to identify hadrons and light nucleus ZDC calorimeter to measure centrality of AA collisions and form trigger Detectors to form T0, L1 centrality trigger and beam monitors Electromagnetic calorimeter for γ,e+e- MWPC chambers will be used as beam trajectory detectors Target & T0 detector Analyzing magnet ZDC mRPC-1 Straw mRPC-2 DCH GEM 2 m Final BM@N setup 3

4 BM&N setup in first technical run in February-March 2015 ToF-700 Scint-700 ToF-400 2 MWPC ToF-700 Scint-700 ZDC DCH-1,2 magnet ZDC Tasks for BM@N technical run: deuteron and C 12 beams with T 0 = 3.5 AGeV Trace beams, measure beam profile and time structure Test detector response: ToF-400, ToF-700, T0+Trigger detectors, DCH chambers, ZDC and ECAL modules, MWPC chambers Test integrated DAQ and trigger system 4

5 Location of MWPCs in technical runs 2015 MWPC layout Deutron Run2 (February, 2015) Carbon Run3 (March, 2015) 5 MWPC served as beam trajectory detectors in deutron Run2 and tracking detectors in carbon Run3

6 MWPC geometry of planes 6 6-plane working area

7 Track-segment building in the MWPC 7 track-segment candidate

8 8 X- V- U+ X+ V+ U- X- V- U+ X+ V+ U-

9 Segments matching between Chambers 2 & 3 in Carbon Run3 9

10 10

11 MWPC detector system alignment Carbon Run3 geometry Z_Ch1= -150 cm; Z_Ch2 = 453 cm; Z_Ch3 = 486 cm; Alignment was done with data without magnetic field (B=0): Beam before target is oriented along Z-axis. After target charged particles are located around zero on Y-coordinate and there extrapolation to Z=0 on X-coordinate must be matched with beam (X=0). 11

12 12

13 13 MWPCs efficiencies (deuteron Run2) Noisy layers: V+, U-, V- After magnet Eff per Ch(4/6) = 96.5 % Eff per Ch(4/6) = 98.3 % Eff per Ch(5/6) 63.5 % 61.0 % 59.0 % Before magnet

14 14 MWPCs efficiencies (Carbon Run3) Eff per Ch(4/6) 98.0 % 99.6 % Eff per Ch(4/6) 95.5 % 97.4 % 95.6 % 98.0 % Eff per Ch(5/6)

15 15 Matching of MWPC segments with DCH tracks By simulation

16 16 Extrapolation of track from DCH to MWPC ( Carbon Run 3 data ) MWPC

17 17

18 BD – the scintillation-strip barrel detector The BD granularity is 40 channels and it consists of 40 scintillation strips BC- 418 with cross section of 7×7 mm2 and 150-mm length. In 2016 the nuclear interaction in the target is triggered by detection of charged particles in a range of polar angle 10° < θ < 150° using a new barrel detector (BD). 18 polar angle 13° < θ < 35°

19 Lambda–hyperon registration in BM@N modeling QGSM generator

20 ELoss, GeV Pz, GeV

21 Z = 0 – 15 cm Z = 16 – 31 cm Ecut=1 MeV Z = 8 – 23 cm Entries Pz, GeV Entries 100 000 MinBias Ev 300 000 MinBias Ev

22 Z = 0 – 15 cm Z = 16 – 31 cm Z = 8 – 23 cm Pz, GeV Z, cm Pz, GeV 100 000 MinBias Ev 300 000 MinBias Ev

23 Summary Track reconstruction algorithm was developed for MWPC chambers ►Track segment reconstruction for each MWPC ►Alignment of MWPC detector system ►Segment matching between chambers 2&3 ►Spatial fit by straight line in two MWPC Efficiencies per plane & per chamber were estimated We attempted to match MWPC segments with DCH tracks: we do not see correlation between MWPC & DCH tracks in Carbon Run due to different geometric layout of MWPC & DCH detector systems. 23

24 24 Thank you for your attention

25 Backup 25

26 BM@N experimental layout in Run3 with carbon beam Beam Monitor (BM), Multiwire Proportional Chambers (MWPC), Drift Chambers (DCH), Time of Flight (ToF), Zero Degree Calorimeter (ZDC) 26

27 Track-segment selecting 27

28 28


Download ppt "Vasilisa Lenivenko Vladimir Palichik (LHEP, JINR ) Alushta, June 2016."

Similar presentations


Ads by Google