Download presentation
Presentation is loading. Please wait.
Published byChristiana Stewart Modified over 8 years ago
1
Changes for 2016 Moving Forward! 2016 ECM Fan Box Bright Energy Solutions! LED High Bay! Chillers! Ready for 2016
2
≤ 75W $35 76W - 110W$40 111W - 160W$60 161W - 275W$70 276W - 400W$90 > 400W$125 ≤ 75W $35 76W - 110W$40 111W - 160W$60 161W - 275W$70 276W - 400W$90 > 400W$125 Must be DesignLights Consortium Listed (DLC) High Bay or Low Bay Luminairs for Commercial or Industrial Buildings LED High or Low Bay Fixtures New Construction Lighting for Businesses
3
LED High Bay / Low Bay Retrofit Retrofit DLC Listed LED
4
New Construction or Retrofit LED Fluorescent
5
Linear LED INSERT YOUR PHOTO
6
Linear LED 1- 4’ Lamps 2- Must be DLC listed 3- $6 per lamp Replacing T12 4- $3 per lamp Replacing T8 Linear LED Lamps
7
Pin Base LED 2 and 4 Pin Base Led $5 Per Lamp Lighting Design Lab Qualified Product List www.lightingdesignlab.com
8
Adds $40 per ton for contractor. Adds $40 per ton for customer. ENERGY STAR 5.42 Tons and Smaller ENERGY STAR 5.42 Tons and Smaller Central A/C and Air Source Heat Pumps Smaller Residential Style Split System Central A/C and Air Source Heat Pumps Smaller Residential Style Split System Quality Install Program HVAC for Businesses
9
HVAC For Business INSERT YOUR PHOTO
10
ECM Hot Water Circulator
11
Tier 1 – Water Cooled Chillers INSERT YOUR PHOTO Measure Requirements Tier 1 Efficiency Water Cooled Full-Load kW/Ton IPLV (kW/Ton) Centrifugal Water Cooled Chillers <150 ton, Part Load Optimized $ 40/Ton0.670.45 Centrifugal Water Cooled Chillers 150-300 ton, Part Load Optimized $ 40/Ton0.600.40 Centrifugal Water Cooled Chillers >300 ton, Part Load Optimized $ 40/Ton0.550.35 Scroll or Screw Water Cooled Chillers <150 ton, Part Load Optimized $ 40/Ton0.750.52 Scroll or Screw Water Cooled Chillers 150-300 ton, Part Load Optimized $ 40/Ton0.680.48 Scroll or Screw Water Cooled Chillers >300 ton, Part Load Optimized $ 40/Ton0.650.49
12
Tier 2 – Water Cooled Chillers INSERT YOUR PHOTO Tier 2 Efficiency Water Cooled Full-Load kW/Ton IPLV kW/Ton Centrifugal Water Cooled Chillers <150 ton, Part Load Optimized $ 55/Ton0.580.41 Centrifugal Water Cooled Chillers 150-300 ton, Part Load Optimized $ 55/Ton0.540.36 Centrifugal Water Cooled Chillers >300 ton, Part Load Optimized $ 55/Ton0.530.36 Scroll or Screw Water Cooled Chillers <150 ton, Part Load Optimized $ 45/Ton0.710.53 Scroll or Screw Water Cooled Chillers 150-300 ton, Part Load Optimized $ 45/Ton0.650.49 Scroll or Screw Water Cooled Chillers >300 ton, Part Load Optimized $ 45/Ton0.610.44
13
All Sizes 1 - Part Load IPLV – 15 EER 2- Full Load – 10 EER 3 - $50 Per Ton Air Cooled Chillers
14
Compressed Air Storage INSERT YOUR PHOTO
15
$1500 Per Blower HP Use of Compressed Air Eliminated Fixed Air Blow Off On Production Equipment Low-Pressure Blower Replacing Compressed Air Low-Pressure Blower Replacing Compressed Air Low-Pressure Blowers INSERT YOUR PHOTO
16
High Frequency Battery Charger
17
Residential Products
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.