d Board of Aldermen Retreat May 19, 2012 City of Wentzville Transportation Program & Street Budget Update Scott J. Smith, P.E., Director of Public Works
2
Mexico Road Improvement Project Wentzville Parkway / Pearce Boulevard Intersection Improvement Project Church Street Improvement Project Wentzville Parkway Additional Turning Lane Project Duello Road Improvements Study David Hoekel Parkway EA Project Wentzville Parkway South Corridor Study
3
2012 Applications Schroeder Creek Boulevard Extension Project Mexico Road Improvement Project (Between Hancock and Guthrie Roads)
4
Projects Completed (C) or In Process (IP) Wentzville Parkway Overpass Construction - C Peine Road Widening & Peine Road Loop agreement with Gundaker - C W Meyer Road Phase 1 & 2, W Meyer Road bridge (Rotary Park) - C Asphalt overlay of Pearce Blvd & E Pitman Ave - C Interstate Drive Phases 2, 3 & 4 Corridor Study – C Interstate Drive Phase 3 Design & Construction - C Interstate Drive Phase 4 partial construction agreement w/Whitaker - C Traffic Signals at: Mexico Rd & Hwy A, Wentzville Pkwy & W Meyer Rd, Wentzville Pkwy & Heritage Pointe, Wentzville Pkwy & Meyer Rd - C I-70 Church Street/Hwy Z Interchange Improvements - C Schroeder Creek Boulevard in front of the LEC - C David Hoekel Parkway Phase 1 & 2 Corridor Study – C Old Business 61 (Luetkenhaus Boulevard) Design & Construction – C David Hoekel Parkway Break in Access Study - IP David Hoekel Parkway Environmental Assessment - IP Mexico Road Design & Construction - IP Church Street Improvement Design & Construction - IP Wentzville Parkway & Pearce Boulevard Intersection Improvement Design & Construction - IP Wentzville Parkway Additional Turning Lane Design & Construction - IP Wentzville Parkway South Corridor Study – IP Duello Road Improvements Study – IP Village Center Redevelopment /Improvements – IP
5
Projects for 2011-2014 Duello Road Improvements Study – Design Costs Wentzville Parkway / Pearce Boulevard Intersection Improvement - Construction Costs Church Street Improvement – Construction Costs Wentzville Parkway from Dierberg to Schroeder Creek Boulevard Design & Construction (Additional Turn Lane) Design & Pre-construction Costs West Meyer Road Phase III Design & Pre-construction Costs Wentzville Parkway South Extension Corridor Study – Design Costs Schroeder Creek Boulevard Extension Design & Pre- construction Costs William Dierberg Drive to Schroeder Creek Boulevard Design & Preconstruction Costs David Hoekel Parkway - Design & Pre-construction Costs Mexico Road (Between Hancock & Guthrie Roads) - Design & Pre-construction Costs
6
Maintenance Needs Concrete Maintenance Annual 4 Miles =$1,200,000.00 to maintain an 71% PCI Asphalt Maintenance Annual 1 Mile =$280,000.00 to maintain a 71% PCI Sidewalks Maintenance Annual 2.4 Miles =$250,000.00 Minimum Annual Maintenance Budget of $1,730,000.00 is needed to maintain today’s PCI Level of 71%. In 2012 - $1,626,000.00 was budgeted a difference of $104,000.00, to the minus, requested.
7
Project NameBrief DescriptionGroup Ranking Maintenance to existing Streets Increase annual amount dedicated to maintenance of existing streets1 Sidewalk program Establish an annual sidewalk extension and replacement program1 Phase I - Wentzville Parkway South ExtensionS Service Rd to Interstate Drive2 Phase V - HoekelInterchange at Hwy 613 Phase II – HoekelInterstate Drive to w Meyer (I-70 interchange)3 Schroeder Creek Boulevard ExtensionContinue road south to West Pearce Boulevard3 Phase I-HoekelS. Pointe Prairie/Peruque Creek to Interstate Drive3 Wentzville Parkway (Schroeder Creek Blvd East to Meyer Road)Add 3rd lane & improve intersection at Meyer4 Phase II - Mexico Road EastHancock Road to Guthrie Road5 May Road Improvement Project Widening and Upgrade from Bear Creek Drive to West Meyer Road6 Phase III - HoekelW Meyer to N Pointe Prairie6 Interstate Drive IVConstruct roadway from Hepperman to S Point Prairie6 Phase IV - HoekelN Pointe Prairie to Peine Rd.7 Phase I - N Pointe PrairieI-70 North service road to W. Meyer7 Phase I - Village CenterW Allen from Pearce to Ash St.7 Phase IV - Village CenterPitman realignment to Main at Lewis St8 Phase II - Village CenterMain from Church Street to Lewis St8 Old Business 61 at Parkway Extend Main Plaza Dr. to Parkway as access to Old Business 619 Phase I - Mexico Road EastJosephville/Hwy A/Mexico Rd intersection to Hancock Road9 Mexico OverpassContinue Great Oaks to Mexico Road9 Phase II - Wentzville Parkway South ExtensionInterstate Drive to Wilmer Rd10 W Meyer Phase III Upgrade roadway from N Point Prairie to bridge west of city limits11 Phase III - Wentzville Parkway South ExtensionWilmer Rd to Hwy N11 Phase VI - Village CenterMeyer under railroad to Main12 Phase II - N Pointe PrairieW Meyer to McCoy Creek bridge12 Phase III - N Pointe Prairie McCoy Creek bridge to Hwy 6113
8
Board of Aldermen Retreat May 19, 2012 City of Wentzville Transportation Program & Street Budget Update