Download presentation
Presentation is loading. Please wait.
Published byPhillip McDaniel Modified over 8 years ago
1
MANAGING HSE IN CONTRACTS 2016 GU140 (C9)
2
01 PR1171 PART I & PR1171 PART II Contract HSE Management – Mandatory for CH and Contractor 03 PR1997 Contractor HSE Technical Evaluation - Banding - Score Sheet and Banding Report 04 C9 HSE Specification - Minimum Requirements 05 REFERENCE DOCUMENTATION Applicable HSE Documents 06 LETTER OF ASSURANCE LoA Questionnaire and Validation Report - Gap Closure HSE IN CONTRACTS 02 T3 HSE Questionnaire
3
WHAT IS A C9? WHAT IS ITS PURPOSE? Contract Document - LEGAL “HSE Specification Minimum Requirements”
4
WHY THE REVIEW SIMPLIFICATION 53, 25, 12
5
DETERMINE RISK PROFILE AND CONTRACT HSE MODE. 1 HSE PREQUALIFICATION 2 T3 AND C9 DEVELOPMENT 3 SITE VISIT CLARIFICATION MEETING 4 HSE EVALUATION 5 CRITICAL STEPS - TASKS KICK OFF MEETING 6
6
HSE WORKSHOP 7 APPROVE HSE MANAGEMENT SYSTEM AND MONITORING PLAN 8 HSE COMMENCEMENT CERTIFICATE (AUDIT) 910 DE MOB SITE RESTORATION 11 CRITICAL STEPS - TASKS CLOSE OUT REPORT 12 IMPLEMENT HSE MANAGEMENT SYSTEM AND MONITORING PLAN
7
3 CRITICAL STEPS DETERMINE CONTRACT RISK PROFILE – H-M-L –Identify and assess the major hazards and risks associated with the contract – C4 DETERMINE MODE OF CONTRACT - 1, 2, or 3 –How will HSE be managed DEVELOP C9 –Use the results of the HSE Assessment to develop Document C9 HSE Specification Minimum Requirements, GU140, for inclusion in Tender Documents.
8
11 ARTICLES Article 1 - HSE Management System & Contract HSE Management Plan Article 2 - Hazard Effect and Management Process (HEMP) Article 3 - HSE Training and Competence Article 4 - Commencement Certificate Article 5 - Performance Monitoring and Reporting Article 6 - HSE Incidents Article 7 - Site Restoration Article 8 - HSE Non-Compliance Penalties Article 9 - Behaviour and Assurance Article 10 - Applicable Documents Article 11 - Company HSE Specific Details
9
Quaesitum?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.