General Meeting Zurich 27.05.2011 Imrich KORPANEC AutoMain Short overview of the project.

Similar presentations


Presentation on theme: "General Meeting Zurich 27.05.2011 Imrich KORPANEC AutoMain Short overview of the project."— Presentation transcript:

1 General Meeting Zurich 27.05.2011 Imrich KORPANEC AutoMain Short overview of the project

2 Acronym (Augmented Usage of Track by Optimization of Maintenance, Allocation and Inspection of railway Networks) for a project focussed on railway maintenance and inspection started on February 2 nd 2011 Partly funded by FP7 of the European Commission Research department Time scale: 2011-2014, 36 months Budget: 3.8 M€, 2.5M€ EC-funding EC funding for EFRTC € 62,364 EFRTC total effort 4,4 man.month over three years No co-funding by EFRTC budget required What is “AUTOMAIN”? EFRTC GM, Zurich, 27.05.2011

3 Objective 1: To adopt best practice from other industries in maintenance optimisation (e.g. highways, aerospace…). Objective 2: To develop novel track inspection approaches for freight routes. Objective 3: To research and assess innovations that have the potential to improve the effectiveness and efficiency of large scale maintenance processes (e.g. grinding and tamping). Objective 4: To further develop key technologies that will drive the development of modular infrastructure design; Focus on: switch maintenance, track inspection, tamping and grinding. Objective 5: To develop a new maintenance planning and scheduling tool that is able to optimise the programme of required maintenance activities Projects’ objectives EFRTC GM, Zurich, 27.05.2011

4 5 rail-infrastructure managers: (Deutsche Bahn(D), Network Rail(GB), Societé National de Chemin de Fer Francais(F), Trafikverket (SE) and ProRail(NL) 4 academic and research institutions: Birmingham(GB), Braunschweig(D), Luleå(SE) and DLR(D) 1 railway contractor: Strukton(NL) 2 railway component industry: Vossloh(F/SE) and MERMEC(I) 3 consultants: Damill(SE), KM&T(GB) and EURODECISION(F) 3 associations: UIC (RU & IM), UNIFE (industry) and EFRTC (private contractors) Project consortium members EFRTC GM, Zurich, 27.05.2011

5 Project Work packages (1) WP1 Functional requirements and objective function - D 1.1Market and customer requirements for the project D 1.2Description of demonstration scenarios and evaluation criteria D 1.3Evaluation of performance impact of AUTOMAIN solutions WP2A new maintenance task analysis approach D 2.1.High level breakdown of maintenance activities D 2.2.Outline for lean process: specifications and opportunities WP 3 High speed inspection D 3.1.In-service inspection measurement algorithms D 3.2.Potential for self inspecting infrastructure WP 4 High speed maintenance D 4.1.Improvements in high speed maintenance and modular infra

6 EFRTC GM, Zurich, 27.05.2011 WP 5 Automated planning and scheduling D 5.1.Planning and scheduling tool ready for optimised maintenance WP 6 Demonstration D 6.1.Demonstration of in-service inspection by regular loco and MMI D 6.2Demonstration of modular, self-inspecting switch technology WP 7 Dissemination, training and exploitation D 7.1.Project Website D 7.2.Dissemination, exploitation and training plan D 7.3.Seminars WP 8 Project management D 8.1.Project brief D 8.2.Project information document D 8.3.Concluding technical report Project Work packages (2)

7 EFRTC GM, Zurich, 27.05.2011 Project organization

8 EFRTC GM, Zurich, 27.05.2011 Thank you very much for your attention ! ! !