Download presentation
Presentation is loading. Please wait.
Published byKelley Pope Modified over 8 years ago
1
2 nd INCEPTION DAY JULY 26, 2016
2
NHIDCL Fast pace construction of National Highways and other Infrastructure in NE Region and Strategic Areas Consolidate South – South East Asia Links and Trade
3
BASIC FACTS INCORPORATED ON 18.7.2014 AUTHORISED CAPITAL Rs. 100 Cr. PAID UP CAPITAL Rs. 5 lakh FUNCTIONAL ON 01.01.2015
4
VISION To be an instrument for creation and management of infrastructure of the highest standard in the country with focus on the North East and Border areas and contribute significantly towards Nation building
5
MISSION To be a professional company which works in most efficient and transparent manner and designs, develops & delivers infrastructure projects in a time bound manner for maximizing benefits to all stakeholders
6
CORPORATE GOVERNANCE Annual Accounts and Report 2014-15 laid before Parliament Profit before tax 2015-16 : Rs. 5.50 crore (Tentative)
7
NHIDCL – BRANCH OFFICES ARUNACHAL PRADESH ASSAM MANIPUR MEGHALAYA MIZORAM NAGALAND SIKKIM TRIPURA J & K UTTARAKHAND A & N ISLANDS KATHMANDU
8
NHIDCL – e Vision e OFFICE, e ACCESS INAMPRO Bringing Infrastructure & Materials Providers together e PACE Real time Project Monitoring & Enhancements INFRACON Platform for Infrastructure Consultants
9
NEW TECHNOLOGIES IDENTIFICATION OF PROBLEMS APPROPRIATENESS OF NEW TECHNOLOGIES INTRODUCTION MODALITIES COLLABORATION WITH IITs
10
OVERVIEW OF NHIDCL PROJECTS Sl. No.StateNos. of Projects Length (in Km.) 1Andaman & Nicobar Islands4330 2Arunachal Pradesh25935 3Assam19479 4Delhi1- 5Himachal Pradesh4320 6Jammu & Kashmir8501 7Manipur181544 8Meghalaya11813 9Mizoram4472 10Nagaland8345 11Sikkim10577 12Tripura6641 13Uttarakhand12896 14West Bengal3433 Total1338286
11
PROJECTS AWARDED 2014 -15 S. No State No of Projects Length in Km. Cost in Rs. Crore 1.Tripura2 122879 2.Assam10 2824008 3.Meghalaya1 62292 4. Arunachal Pradesh 5 134 1379 Total18 6006558
12
AWARDS FINALISED 2015 -16 S. No State No of Projects Length in Km. Cost in Rs. Crore 1.Assam4821917 2.Arunachal Pradesh71981525 3.Nagaland3431066 Total143234508
13
PROJECTS TO BE AWARDED 2016 -17 S. NoState No of Projects Length in Km. Cost in Rs. Crore 1.Assam1191600 2.Delhi1-8.90 3.Nagaland1231200 4.Arunachal Pradesh94044486 5Sikkim349770 6Manipur120869 Total165158934
14
DONER PROJECTS To Be AWARDED 2016-17 1DOLMUKH - HARMUTI 2TURA - MANKACHAR 3SHERKHAN – BAGHA BAZAR 4WOKHA – MERAPANI -GOLAGHAT 5TAMAI – TANING
15
OTHER PROJECTS PMC for NEPAL’s Postal Road Project Multi-level Parking in Transport Bhawan, New Delhi
16
SAFETY CONCERNS DEFINING HILL SAFETY STANDARDS IDENTIFYING BLACK SPOTS Collaboration With INTERNATIONAL ROAD FEDERATION
17
SKILL DEVELOPMENT IDENTIFYING NEEDS WORKING WITH STAKEHOLDERS Collaboration With INFRASTRUCTURE EQUIPMENT SKILL COUNCIL
18
PROJECTS OVERVIEW As of date, NHIDCL entrusted with 133 projects in 14 states covering 8286 Km which are at various stages of project development (DPRs, LA and other clearances)
19
TRANSPARENCY Use of NIC portal for e- Procurement Integrity Pacts signed Independent External Monitor being appointed
20
NHIDCL WHAT WE PROMISE : WE DELIVER ONE VISION ONE MISSION
23
THANK YOU
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.