Presentation is loading. Please wait.

Presentation is loading. Please wait.

1004E Posting Snow Clearing Picture of the Week E. Lessard Collider-Accelerator Department 2-11-14 Take 5 for Safety.

Similar presentations


Presentation on theme: "1004E Posting Snow Clearing Picture of the Week E. Lessard Collider-Accelerator Department 2-11-14 Take 5 for Safety."— Presentation transcript:

1 1004E Posting Snow Clearing Picture of the Week E. Lessard Collider-Accelerator Department 2-11-14 Take 5 for Safety

2 B1004E Compressor Building is Now C-AD’s Only ODH-1 Posted Building  You need ODH-1 training and current ODH -1 physical to enter  You must wear a calibrated Portable Oxygen Monitor (POM) to enter the building  You must first open the door and hold the POM at arm’s length at the building door to verify that the oxygen concentration in the building is safe  You DO NOT need an escape pack to enter, only the POM - it takes no more than ~15 seconds to exit the building (it is small) if your POM alarms  There are always 2 escape packs in the building mounted and labelled on the wall for use if needed  The building is keyed with a lock and only Cryo has the key  This will help ensure that all non-cryo entrants are fully familiar with the entry requirements and with the ODH hazards in this new building 2

3 3

4 Snow Clearing  We give BNL a plan for snow removal priorities at the C-A complex, which they will follow but unexpected problems occur  Please call MCR (4662) if you need an area cleaned of snow for machine or experiment access  You may spread ice melt for your own safety if you can't wait for the custodians or none are available to help

5 5 Expect the Unexpected


Download ppt "1004E Posting Snow Clearing Picture of the Week E. Lessard Collider-Accelerator Department 2-11-14 Take 5 for Safety."

Similar presentations


Ads by Google