Download presentation
Presentation is loading. Please wait.
Published byLillian Parsons Modified over 8 years ago
1
Central Energy Plant Cooling Tower Team Members: Heath Nance Roy Quinn September 23, 1998
2
Outline Background Schematic Drawing Data Collection Results Conclusions Question
3
Schematic Drawing
4
Data Collection
5
humidity (wet & dry bulb temp) ambient temperature exiting air velocity
6
Equipment humidity- sling psychrometer ambient temp- anemometer air flows- turbine anemometer water temperature- thermometer psychrometric chart
7
Psychrometer Readings
8
Exit Airflow Data
9
Volumetric Airflow
10
lbs. of water/lbs. of dry air
11
Enthalpy
12
Formulas q = m ( hout - hin ) mass flow rate = flow rate of air / volume per mass of dry air volumetric flow rate = n ( r2 / 4 )
13
Calculations Total Volumetric Airflow 2,711,065 cubic ft/min Avg Mass Flow Rate 9,420,625 lbs. DA/min Heat Rejected to Atmoshpere 48,346 btu/day
14
Conclusions Explained cooling tower Schematic illustration Discussed data collected Results
15
Questions
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.