Download presentation
Presentation is loading. Please wait.
Published byJoella Underwood Modified over 8 years ago
1
Advanced Remote Tower 1 13 Nov 2007Malmö/Sturup1 Advanced Remote Tower WP1.3, WP2.3 Malmö/Sturup 13 Nov 2007
2
Advanced Remote Tower 13 Nov 2007 Malmö/Sturup2 WP 1.3 – Cab adaptation design WP leader: Leif Hagmann, LFV Participants: Saab, LFV, Equipe, LYYN Output: “Iterate plans for installation of additional hardware and testing and tuning of new and existing hardware” Milestones: T3 (31 Jan 08) – draft “cab adaptation plan” Draft content: - Plan for replacement of existing cab outside-view monitors with 360 degree screen and high resolution projectors - New or rearranged interiors and furniture for housing controller displays and input devices - Evaluation of required hardware, adaptation, development or purchase T6 (30 Apr 08) – final “Cab adaptation plan delivered”
3
Advanced Remote Tower 13 Nov 2007 Malmö/Sturup3 WP 2.3 – Cab adaptation WP leader: Magnus Aronsson, LFV Participants: Saab, LFV, Equipe, LYYN Output: “Finalise cab adaptation, tune and enhance installed hardware and software” Contents: - Initiate cab adaptation based on draft “cab adaptation”: - Installation of 360 degrees screen and projectors - Connect to actual airport cameras - Installation of hardware and systems, initiate evaluation tests - Install additional hardware, tune and enhance installed hardware and software. Milestones: T12 (31 Oct 08) - Cab adaptation documentation
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.