Presentation is loading. Please wait.

Presentation is loading. Please wait.

2011-04-08E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.

Similar presentations


Presentation on theme: "2011-04-08E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration."— Presentation transcript:

1 2011-04-08E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration

2 2011-04-08E. Hazen2 AMC13 Status ● What is AMC13? (review) ● Potential users ● DAQ Interface ● Status / Plans ● M&S Cost

3 2011-04-08E. Hazen3 Spartan 6 Virtex 6 GT X SFP GT X SFP GT X SFP GT X IO SFP? CD S 128 Mbyte DDR3 GT P Flash IO TTC DAQ 6Gb/s Spar e MMC uC IPMI GbE JTAG LED s MCH1 Front Panel via T3 Fabric A 12 ports £ 3.125 GB/s Fabric B 80 MB/s CLK F/O 40.xx CLK To AMCs CMS AMC13 Module Block Diagram Optional RAM DAQ 6Gb/s 2:1 Switc h

4 2011-04-08E. Hazen4 AMC13 Board Stack T1 T2 T3 T4 New custom T1 base board MMC functions (as AMC-13) TTC optical rx 3 or 4x SFP Cross-over GbE from MCH1 for controls and local DAQ Clocks board Clock / controls fanout T3 board Provides JTAG / LEDs on front panel Crosspoint switch for trigger applications (could be omitted if some other solution is found for front panel) ● Base configuration has only tongues 1, 2 ● Base board - With optics and HS links (Fabric A) ● Clocks board - distributes LHC clock and controls ● Mezzanine connector for T3 with I2C ● T3 has JTAG and LEDs Connector to T3 provides: Power Serial bus (SPI or I2C) from MMC Front-panel signals: JTAG or SPI for miniUSB Status LEDs Quad SFP+ Cage

5 2011-04-08E. Hazen5 AMC13 Users ● HCAL – 16 crates ● RCT – 6 crates ● Assisting in design (provided MMC) ● Will use AMC13 for either CCT or TMT options ● GT – 4? crates ● Discussed at some length this week ● GCT ? DTTF ?

6 2011-04-08E. Hazen6 DAQ Upgrade ● FRL will eventually be replaced by Fiber... the question is when, and what protocol. HCAL will be first with some number of FEDs during 2013 shutdown ● Intensive negotiations continue... in my opinion an adapter will not be required, but stay tuned!

7 2011-04-08E. Hazen7 AMC13 Progress ● Schematics are done! ● T1 layout is done! T2 should be done this week ● BOMs are available!

8 2011-04-08E. Hazen8 AMC13 Plans / Schedule ● T1+T2 layout ready for review this week ● Internal review (only) for prototype (by engineers, perhaps Frahm, Gorsky, Iles) ● Fabricate 10 pieces (plus spare parts) ● Aim for mid-July delivery of assembled boards ● Distribute to Early Adopters after smoke test (August) ● Develop early firmware (based on DTC) during PCB fab/assembly ● Integrate with MiniCTR2C Sept-Nov ● … further planning must fit with HCAL schedule ● This depends on continuous funding!

9 2011-04-08E. Hazen9 AMC13 M&S Costs ● For 10 pieces (BU was allocated $5k M&S this year)


Download ppt "2011-04-08E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration."

Similar presentations


Ads by Google