1
Preinjectors Status D. Raparia January 26, 2016 Time Meeting
2
EBIS Status EBIS running stably Au with 6, or 8 pulses
Rotary target working stably at slow rate D. Raparia
3
Linac Status Linac running in good condition for BLIP at 117 MeV and uA with raster Linac ran for BLIP ran during the snow storm Due to tube in mod 3 , beam current is reduced We will change this tube tomorrow (2.5-3 Hrs) D. Raparia
4
Average Current for BLIP
RF Mod 2 8616 Raster magnet RF (RFQ, Mod1, Mod5) PQ49 D. Raparia
5
J. Nelepa D. Raparia
6
Beamline Location 21’ 14’ plunging harp plunging harp (opposite side)
6.50” collimator bellows (3x) raster magnet steering magnets (existing, 2x) 4.00” collimator plunging harp (opposite side) laser profile monitor beam current transformers (2x) beam position monitor beryllium window (existing) aluminum bellows (existing)