Download presentation
Presentation is loading. Please wait.
Published byConstance Ball Modified over 8 years ago
1
CEPC Status Report Yifang Wang Institute of High Energy Physics
2
Status Pre-CDR completed CDR end of 2016 – Conceptual design of accelerators – Conceptual design of civil construction Team in China organization Future: national team and international organization R&D request to MOST: ~ 100 M RMB R&D to commission of development and reform through CAS ~ 1B RMB – No idea when the review will start
3
Progress MOST organized a meeting to discuss CEPC MOST will organize a meeting to discuss – Science significance – Technology implications – International organization Organized a CEPC physics workshop with DOE in Aug. 10- 12 First IAC meeting in Sep. 16-17 Will organize an industrial consortium Will study international organization(CERN, ITER, FAIR, ILC, …) Future target: a project similar to ITER by MOS
4
International Advisory committee David GrossEckhard Elsen Luciano MaianiPeter Jenni Michelangelo ManganoHarry Weerts Joe LykkenYoung-Kee Kim Henry TyeIan Shipsey Hitoshi Murayama*Michael Davier Rohini Godbole*Geoffrey Tayler Katsunobu OideGeorge Hou Steinar StapnesLucie Linssen John SeemanBarry Barish Eugene LevichevBrain Foster Robert PalmerHesheng Chen * Not confirmed yet
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.