e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 1 Global Project Planning: a Novel Approach through a Universal e-Engineering Hub - a Case Study of Seismic Risk Analysis Presented by Prof. M. Skibniewski Compiled by Profs. G. Augenbroe, Z. Ren, C. J. Anumba, T. Hassan, M. Mangini
2
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 2 Outline The e-Engineering Hub The seismic engineering scenario Workflow and templates Conclusion
3
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 3 The e-Engineering Hub
4
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 4 Business Perspectives Efficient integration of engineering services on an ad- hoc basis into globally scoped engineering projects is of strategic importance for the productivity and competitiveness. Good project preparation is a key for the effectiveness of dispersed collaborative engineering teams. Generic PP functionality paves the way for a whole range of other services that enhance the productivity and competitiveness.
5
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 5 Technology In the e-Hub, collaborative PP is a managed process that transparently generates a set of comprehensive project plans, in nature and logically ordered. The e-Hub contains a collection of PP models. Each consists of a PP process model, represented with WF models, that incorporates the coordination logic of how project planners negotiate and reach a resolution on one of the aspects that need to be tactically agreed. The WF model controls who has read or write access to which field. Each of the WF models operates on one or more content templates, which is an ordered set of fields with specific meaning.
6
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 6 Functional Architecture Project charter Project scope statement Project Execution Plan Project schedule Quality plan Risk plan Communic- ation protocol Change mgt. protocol Project Contracting Agreement Conditions of Contract Generic Project Definition and Planning Workflow General Negotiation Workflow Document Templates Project charter template Scope statement template Project schedule template Quality plan template Risk plan Template Communicat ion protocol template Change protocol template Contract template
7
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 7 Seismic Scenario
8
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 8 Background The Client eRiskZone Geodeco e-Hub PP platform Soil investigation subcontractor Structural dynamic analysis consultant
9
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 9 eRisk Zone e-Hub http://www.geodeco.it/eRiskZone/eRiskZone.html
10
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 10 Project description Input requirements Output requirements Special requirements Project cost. Project activity Partners required Project schedule Contract negotiation WF1 WF2 WF3
11
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 11 WF1: Project Definition and Cost Estimate
12
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 12 Project definition and cost estimate workflow Describe project Define Input Define output Define extra requirements Negotiate cost Generic project planning/ negotiation workflow (i.e. propose check modify check modify …
13
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 13 Master Process Sub-flows WF1: Project Definition and Cost Estimate in JAWE
14
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 14 WF1: Master Process
15
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 15 WF1: Sub-Flow (Define Input)
16
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 16 WF1: Enactment
17
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 17 WF2: Task Definition, Extra Partner Finding and Project Schedule
18
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 18 Document Template (2): Task Definition and Project Schedule 1)Activities –ID No. –Title –Description –Responsibility –Pre-conditions –Post-conditions 2)Dependencies –Precedent activity –Successor activity 3)Duration – - Time/Date 4)Deliverables –ID no. –Title –Description –Responsibility 5)Milestones – ID no. –Title –Description –Date
19
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 19 Activity definition and project schedule workflow Define activities Identify extra partners Define schedule Define decencies define duration define deliverables define milestones Generic project planning/ negotiation workflow (i.e. propose check modify check modify …
20
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 20 Project planning tool ( e.g. Gattproject ) is used to schedule the project The scheduling and negotiation process is facilitated by the coordinator. The negotiation information will be saved either in the eRisk zone or in the eHub.
21
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 21 WF3:Contract Negotiation
22
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 22 WF3: Master Process Co-ordinator selects and inputs project general information These sub-flows will guide users to negotiate the key contract items
23
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 23 WF3: Sub-Flow (Negotiate Cost) ‘Project cost’ will be saved into the related contract clause after this activity is enacted.
24
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 24 Geodeco Engineering Service Contract Template (1) WF3 will guide users to negotiate these key issues in the contract template Contract clauses
25
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 25 Geodeco Engineering Service Contract Template (2) The results of WF1 & WF2 are attached in the agreement
26
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 26 eLEGAL Contract Editor ‘ eLEGAL Contract Editor is used to negotiate ‘Conditions of Contract’ which is an attachment of the Agreement
27
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 27 Highlights The seamless integration of eRiskZone with e-Hub; The adoption of the best breed e- Engineering tools -The integration of Ganttproject -The use of eLEGAL Contract Editor
28
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 28 Thank you for more see the online demon http://elf.eurodyn.com:8080/edos/index.do http://elf.eurodyn.com:8080/edos/index.do
29
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 29 Project description Project ID Project title Project description (e.g. nature, service required, location, etc.) Attachments Go back
30
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 30 Input requirements Input ID Input items Input description Level of requirements Format requirements Date of submission Go back
31
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 31 Output requirements Deliverable ID Deliverable items Deliverable description Type of service Level of service Options required Date – Deadline – Milestones Yes/no If yes, then 1) item, 2) description, 3) date – Final submission date Go back
32
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 32 Method/ resource/ quality of the work Particular requirements? If resource, – Manpower – Material – Machinery – Other particular services If method, then… If quality, then… Go back
33
e-Engineering enabled by Holonomic and Universal Broker services 09/09/04 33 Cost estimate Cost system – Fix rate – Lump sum item – Negotiated rate Amount Payment approach Liquidated damage Quality retention amount Go back