INVENTORY AND INSPECTION FOR GAS TURBINE COMPONENTS( GT22)
3
INVENTORY AND INSPECTION FOR FIXING FRAME DIFFUSER ( GT21 )
6
INVENTORY AND INSPECTION FOR ACOUSTICAL ENCLOSURE
7
INVENTORY AND INSPECTION FOR FIXING FRAME DIFFUSER ( GT21 )
9
INVENTORY AND INSPECTION FOR GAS TURBINE COMPONENTS FOR GT21
22
INVENTORY AND INSPECTION FOR GAS TURBINE COMPONENTS FOR GT21 REP.3-10-2012
24
INVENTORY AND INSPECTION FOR GAS TURBINE COMPONENTS FOR GT21 REP.
25
INVENTORY AND INSPECTION FOR GAS TURBINE COMPONENTS FOR GT21
26
ARRIVAL OF EXHAUST SIDE MODIFICATION MATERIALS REP.6-10-2012
28
INVENTORY AND INSPECTION FOR GAS TURBINE COMPONENTS FOR GT21 REP.7-10-2012
30
INVENTORY AND INSPECTION FOR GAS TURBINE COMPONENTS FOR GT21 REP. 8-10-2012
32
INSPECTION FOR GAS TURBINE GT23 PHOTO 1
33
INSPECTION FOR GAS TURBINE GT23 PHOTO 2
34
INSPECTION FOR GAS TURBINE GT23 PHOTO3
35
INSPECTION FOR GAS TURBINE GT23 PHOTO 4
36
INSPECTION FOR GAS TURBINE GT23 PHOTO5
37
INSPECTION FOR GAS TURBINE GT23 PHOTO 6
38
INSPECTION FOR GAS TURBINE GT23 PHOTO 7
39
INSPECTION FOR GAS TURBINE GT23 PHOTO 8
40
INSPECTION FOR GAS TURBINE GT23 PHOTO 9
41
INVENTORY AND INSPECTION FOR GAS TURBINE COMPONENTS FOR GT21
43
RECEIVING THE RAILWAY FOR GT SKIDDING ON THE 14 TH OF OCT. 2012
47
HANDING OVER 1/3 OF SHAFT SLEEVE FOR GT22, GT23
50
HANDING OVER THE GAS TURBINE FOR UNIT 21 22.OCT.2012
51
PREPARATION FOR LOADING GT21 FROM MOE STORES TO SITE
52
LOADING GT21 ON FROM MOE STORES TO SITE
53
HANDING OVER THE GAS TURBINE FOR UNIT 21 22OCT.2012
59
LOADING GT21 ON FROM MOE STORES TO SITE
60
HANDING OVER THE GAS TURBINE FOR UNIT 21 22OCT.2012
62
PREPARATION FOR UNLOADING GT21