Download presentation
Presentation is loading. Please wait.
1
Drive Beam Feedforward and Compression
Current layout Issues Ideas for changes in the layout
2
Current Layout Final Compression, Phase Correction PETS
First Compression, Phase and Energy Measurement Combiner Rings DB Accelerator Gun
3
Issues Energy spread is limited, i.e. a huge R56 is required for compression An incoming energy jitter will cause a huge phase jitter The phase correction must allow a huge correction range while maintaining an accurate phase correction 12GHz) The correction kickers must be strong and accurate The kickers require a lot of space and will be expensive (remember that we need 48 of these systems)
4
Some ideas for layout changes 1
Split phase correction in two parts => more accurate correction Zero total R56 behind final acceleration => phase becomes independent of energy jitter Final Re-compression, Phase Correction PETS DBA 2 First Re-compression, Phase and Energy Measurement Final compression, Phase Correction CR Uncompression DBA 1 Gun First Compression, Phase and Energy Measurement
5
Some ideas for layout changes 2
Since we don't expect any phase jitter to be induced in the beam lines behind the combiner rings* we could use a single correction system instead of 24 => simplify beam lines and reduce cost *there might be some jitter from the loop, but this cannot be corrected in any case Final Re-compression, Phase Correction PETS First Re-compression, Phase and Energy Measurement Final compression, Phase Correction CR DBA 2 Uncompression DBA 1 Gun First Compression, Phase and Energy Measurement
6
Some ideas for layout changes 3
If the combiner rings and the loops could be build in a way that CSR is small even for final bunch lengths we could remove uncompression and re-compression. Phase measurement and correction could be integrated in the loops => simplify beam lines and reduce cost Phase Correction via orbit bump in loop PETS Phase Measurement Final compression, Phase Correction CR DBA 2 DBA 1 Gun First Compression, Phase and Energy Measurement
7
Some ideas for layout changes 4
Again one can argue that we might not need 24 feed-forward systems on each side => simplify beam lines and reduce cost PETS Phase Correction via orbit bump in loop Final compression, Phase Correction CR DBA 2 Phase Measurement DBA 1 Gun First Compression, Phase and Energy Measurement
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.