Presentation is loading. Please wait.

Presentation is loading. Please wait.

METAC Workshop March 14-17, 2016 Beirut, Lebanon National Accounts Compilation Issues Session 5.1: Construction, Price and Volume measures.

Similar presentations


Presentation on theme: "METAC Workshop March 14-17, 2016 Beirut, Lebanon National Accounts Compilation Issues Session 5.1: Construction, Price and Volume measures."— Presentation transcript:

1 METAC Workshop March 14-17, 2016 Beirut, Lebanon National Accounts Compilation Issues Session 5.1: Construction, Price and Volume measures

2 Content Construction output, specific features Data available – Price indices – Volume data – Administrative data Methods – Complete construction – Other elements of construction output

3 Construction output … covers a wide range of products: – one-dwelling and multi-dwelling buildings, – industrial and commercial buildings, – highways, railways, and other major civil engineering projects. Types of construction work: – new construction, – major improvement of existing structures and – regular repair and maintenance.

4 Construction output Other features of the construction activity require attention in measuring output at both current and constant prices: – projects may span two or more accounting periods; – project can be considered unique and should therefore be decomposed wherever possible into standard activities that can be priced between periods

5 Data available Input, Output, and Seller's price indices used for deflation of specific type of construction output; The Purchasing Power Parities (PPPs) program for construction: – … collection of detailed data which can be used as a helpful comparative source for pricing a 'standard' output; Quantitative information on building materials used; Labor input; Administrative data on government projects.

6 Methods Deflation – Input price indices – Output price indices – Seller's price indices

7 Methods Deflation, using input price indices Possible methods for estimating output price indices: – "actual prices" method takes data from real projects undertaken during the period, or adjusts tender price indices to match the relevant time period … resource intensive, but can be used for all types of construction, if suitably weighted, if some generic designs are used repeatedly, and if a sufficiently large sample of projects is taken; not appropriate for unique projects; – "model pricing" method, which constructs a theoretical "model project" (such as a one-family dwelling) using tender price data from standard price books or statistical surveys;

8 Methods Possible methods for estimating output price indices: – "hedonic" method, which attempts to define the quality of a structure in terms of its characteristics and regress them against price … employed only in suitable areas of construction. Volume methods, if there is no options for detailed deflation – measuring cubic meters of construction, or – the number of building permits issued

9 Methods Civil Engineering – decomposition of the project into a set of more measurable components; – collect detailed prices as part of the administrative control of public building contracts Repair/Maintenance – collect data on hourly rates or quotes for 'model' jobs from contractors, and then to use these as indicators of price; – for small repair and maintenance work undertaken by private households: CPI indices for materials commonly used in these activities can be employed

10 Methods Own account construction – deflated by an appropriate index, the closest market-based index available related to residential dwellings or a subset of that

11 References 2008 SNA, Chapter 15 Construction Price Indices, OECD-Eurostat Handbook on price and volume measures in national accounts, Eurostat

12 Thank you


Download ppt "METAC Workshop March 14-17, 2016 Beirut, Lebanon National Accounts Compilation Issues Session 5.1: Construction, Price and Volume measures."

Similar presentations


Ads by Google