Download presentation
Presentation is loading. Please wait.
Published byDiane Ward Modified over 8 years ago
1
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM 0.000 TO KM 53.000) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00 KM 53.00 LINGALA CANAL Head Regulator Discharge: 1350 C/s CHITRAVATHI RIVER LINGALA TANK BONALA TANK IPPATLIA TANK YERRABALLI TANK 300 Ac. KM 29.125 500 Ac. KM 31.00 500 Ac. KM 43.00 800 Ac. KM 44.00 2,400 Ac. 4,800 Ac. CANAL WIDTH : 12 M Discharge: 37 C/s Bed width: 2.44 M LENGTH OF CANAL: 53 KM DISCHARGE – 1350 C/S AYACUT – 25,000 ACRES Link Canal Goddumarri Anicut PBC Km14.978
2
C.B.R RIGHT CANAL (LINGALA CANAL) 1 PROJECT PROFILE Excavation of CBR Right Canal from Km.0.00 to Km.53.00 and its distributaries and including construction of CM & CD works and Link Canal to Pulivendula Branch Canal. 2 Revised Admn. Sanction: G.O.Ms.No. 52, Dt:10-6-04, for Rs. 32.00 Crores (Revised admn Apprl. for Rs.150.43Crs under sanction) 3No. of Packages:1 4Agreement value of packages:Rs. 148.05 Crs 5Expenditure 2004-05:Rs. 8.29 Crores. 2005-06:Rs. 28.52 Crores Cum. Exp.:Rs. 36.81 Crores. 6Utilisation:3.60 TMC 7AyacutNew Ayacut:25000 Acres 8Storage capacity to Chitravati Reservoir:10 TMC 9Land Acquisition Required (canals):1135.00 Acres Requisitione d :978.15 Acres
3
11Power required:1.40 MW 1Lift-I Lift Height:24 m No. of Pumps:1 No. Total pumps capacity:750 HP / 0.56 MW 2Lift-II: Lift Height:20 m No. of Pumps:1 No. Total pumps capacity:350 HP/ 0.26 MW 3Lift-III Lift Height:33 m No. of Pumps:1 Nos. Total pumps capacity:125 HP / 0.09 MW C.B.R RIGHT CANAL (LINGALA CANAL) 10Forest Land:263.31 Acres Present Status: CCF inspected the lands and sent report to IG of Forests
4
4Lift-IV Lift Height:15 m No. of Pumps:1 No. Total pumps capacity:75 HP / 0.06 MW 5Lift-V: Lift Height:42 m No. of Pumps:1 No. Total pumps capacity:450 HP / 0.34 MW 6Lift- VI Lift Height:20 m No. of Pumps:1 No. Total pumps capacity:125 HP / 0.09 MW 12Mobilization Advance Paid Recovered 2004-05:Rs. 7.4 Crs --- 2005-06: -- Rs. 4.62 Crs Total: Rs. 7.4 Crs Rs. 4.62 Crs. 13Target Date:3/2007 C.B.R RIGHT CANAL (LINGALA CANAL)
5
PK G No. Description Name of Contractor Bid /Agreemen t Amount Rs in Crs. Agreeme nt conclude d date Mobilisation Advanace Rs. in Crs. 1 Excavation of right main canal (Lingala canal) from KM 0.00 to KM 53.00, CM & CD works, distributaries, field channels etc. to irrigate 25,000 acres and Construction of Link canal to Pulivendula Branch Canal, Cross regulator, Head regulator, Supply of vertical gates etc M/s Mythas – NCC, Hyderaba d 148.053 / 20057.40 CATERGORY-I FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM 0.000 TO KM 53.000)
6
Package / Cat – II Excavation of CBR Right Canal (53 Km length), Distributaries CM & CD works, Link canal to Pulivendula branch canal CHITRAVATHI BALANCING RESERVIOIR RIGHT CANAL (LINGALA CANAL) Name of the Contractor: M/s MAYTAS-NCC (JV) Agreement Amount : Rs. 148.05 Crs. Agreement Date: 25-03-2005 Period of Completion: 24 Months Target date of Completion:3/2007 1 Investigation : Completed 2a) Designs (canals) : Approved 3a) Execution: (Canal) : 17.25 KM in progress against total length of 55 KM 4a) Qty. of earth work done 14.28 Lakh cum against 65 Lakh cum. 5 No. of Machinery (Machinery wise) deployed Poclains 8 Nos., Dozers – 4, Tippers -6 6Expenditure:Rs. 36.81 Crs. (Inc. Mob. Adv. Rs. 7.4 Crs. ) against 148.05 Crs. 2004-05:Rs. 8.29 Crs. (Inc. Mob. Adv. Rs. 7.4 Crs) 2005-06: Rs. 28.52 Crs. 7Mob. Advance recovered : Rs. 4.62 Crores. 8Land Acquisition : Required : 1135 Acres; Requisitioned : 978.15 Acres