Download presentation
Presentation is loading. Please wait.
1
Board of County Commissioners
Public Hearings September 22, 2015
2
Ruby Lake Planned Development (PD) /
Lot 3 Preliminary Subdivision Plan (PSP) Case: PSP Project: Ruby Lake PD / Lot 3 PSP Applicant: Adam Smith, VHB, Inc. District: 1 Acreage: gross acres Request: To subdivide and construct 236 single-family residential dwelling units on gross acres. In addition, two (2) waivers from Orange County Code Sec (a) and Sec are being requested to eliminate the requirement for landscaping and sidewalks within the unopened right-of-way on the west side of the property.
3
Ruby Lake Planned Development (PD) /
Lot 3 Preliminary Subdivision Plan (PSP) Future Land Use Map
4
Ruby Lake Planned Development (PD) /
Lot 3 Preliminary Subdivision Plan (PSP) Zoning Map
5
Ruby Lake Planned Development (PD) /
Lot 3 Preliminary Subdivision Plan (PSP) Aerial Map
6
Ruby Lake Planned Development (PD) /
Lot 3 Preliminary Subdivision Plan (PSP)
7
Action Requested Make a finding of consistency with the Comprehensive Plan (CP) and approve the Ruby Lake PD / Lot 3 Preliminary Subdivision Plan (PSP) dated “Received July 27, 2015”, subject to the conditions listed under the DRC Recommendation in the Staff Report. District 1
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.