28-11-2007P. Kuijer1 System run coordinator meeting 28-11-2007.

Similar presentations


Presentation on theme: "28-11-2007P. Kuijer1 System run coordinator meeting 28-11-2007."— Presentation transcript:

1 28-11-2007P. Kuijer1 System run coordinator meeting 28-11-2007

2 P. Kuijer2 Shifts in December 2007 Two periods –10-15 December –16-21 December –No overlap required (but allowed), SRC guarantee information transfer Allow shifts less than 1 week, credit per day –Many people should be trained! First shift 8-16 on December 10 –Allow start-up by experts during day shift (e.g. DAQ setup) Shutdown all detectors in dayshift December 21, cancel evening shift –CERN services will be shut down Need 25 workplaces (each subsystem, excluding offline) –Seating will be defined by RC, one place per detector –ACR workplaces reserved for detectors in the process of inclusion in DAQ SRC make sure that shifters have access: –Need to do the Safety course in building 53 a week before. –Request and check access rights in EDH: LHC-12, LHC-24, ACR, ALI-COF SRC send shift schedule to RC –Names, phone numbers, day/time, institute SRC must be near CERN and reachable at all time by mobile phone

3 28-11-2007P. Kuijer3 Activities Each detector group manages its detector –Full control while standalone –Monitoring when included in global DAQ partition First week (10-15 December) –Detectors should be tested with DAQ/ECS before the run as much as possible –Include detectors (known good ones first) in DAQ/ECS/DCS –Detectors not in global partition prepare and test standalone –TPC runs in standalone for characterisation –Stable running for DAQ checks –Stable running for trigger checks? Second week (16-21 December) –Attempt including TPC in DAQ/ECS/DCS –Evaluation of status reached –Stable running for cosmic data –Stable running for trigger tests?

4 28-11-2007P. Kuijer4 General shifts Priorities set by run coordination on day to day basis Piquet contact through run coordination SLIMOS –4 persons M. Tavlet, H. Taureg, A. di Mauro, A. Tauro –No training defined, but volunteers can contact Marc Tavlet or Paul Kuijer DAQ/ECS operators –DAQ group present on all shifts –Trainees wanted (6) DCS operators –DCS group present at all shifts –Trainees wanted (6) Offline –Data integrity checks? –Detector QA? –Global reconstruction? –Who?

5 28-11-2007P. Kuijer5 SRC On shift On call People wanted Online QA Offline QARemarks DAQ Pierre van de Vyvre16 DCS Lennart Jirden16 SLIMOS Marc Tavlet1dcs?-- CTP David Evans HLT Jochen Thaeder2 SPD Petra Riedler SDD Lodovico Riccati SSD Panos Christakoglou21 TPC Chilo Garabatos? TRD Johanna Stachel TOF Gilda Scioli MUON TK Florent Staley MUON TG Alfredo Musso HMPID Paolo Martinengo FMD Jens-Jorgen Gaardhoje T0 Wladek Trzaska V0 Jean-Yves Grossiord2 ZDC Mauro GallioFew days debug? ACORDE Arturo Fernandez Tellez PHOS CP Vladislav Manko PMD Yogendra Viyogi EMCAL David Silvermyr

6 28-11-2007P. Kuijer6 Detectors Online QA by detector shifts –Verify data headers and trigger information –Check detector specific data integrity –Check noise, zero suppression, …. –Online event display? Offline QA –To be defined? If TPC in global partition –Correlation between TPC and others online? –Global reconstruction offline? Event selection from ACORDE+scintillator –Rate will be low, depends on ACORDE bitpattern working –SSD + SDD calibration? (rate 0.001 Hz)? –With SPD: maybe ITS tracks? no software exists! Rate?

7 28-11-2007P. Kuijer7 Contact Do not hesitate to contact me –Mobile: 165700 –Email: Paul.Kuijer@cern.ch –Office: 23-1-020