Presentation is loading. Please wait.

Presentation is loading. Please wait.

WP2 Planning per 2011-05-27. Objectives of WP2 ●Definition of multi-faceted component-model with support for ●Expressiveness for non-functional attributes.

Similar presentations


Presentation on theme: "WP2 Planning per 2011-05-27. Objectives of WP2 ●Definition of multi-faceted component-model with support for ●Expressiveness for non-functional attributes."— Presentation transcript:

1 WP2 Planning per 2011-05-27

2 Objectives of WP2 ●Definition of multi-faceted component-model with support for ●Expressiveness for non-functional attributes ●Versioning ●Variants ●Need to capture “same” attribute in various ways: ●Requirement ●Analysis result ●Test result ●Min, max, average, x% percentile, etc ●Need to capture validity of attribute ●Platform dependencies ●Hardware ●Software ●Version/variant dependencies

3 Objectives of WP2 (cont) ●Traceability in transformations ●Model-to-model ●Model-to-text ●Text-to-model ●Forward annotations with meta-data ●Backward annotations with attributes ●Traceability between versions/variants

4 WP2 Tasks ●Task 2.1 – Reference DECISIVE modeling language ●Based on: ●Evaluation of state-of-the-art ●Needs of industrial partners ●Not a new language ●UML-based language ●Profile ●(Domain Specific Language possible?) ●Re-use previous efforts e.g. ●CHESS, MARTE, SysML, EAST-ADL2, etc.

5 WP2 Tasks ●Task 2.2 – DECISIVE editor ●Graphical editor ●Expressiveness of DECISIVE modeling language ●Full expressiveness or use of other tools? ●Input and output to other tools and languages ●Support multiple 3 rd party dev. environments ●One tool of focus for DECISIVE development

6 WP2 Tasks ●Task 2.3 – Forward and backward transformations ●Generate traceability in forward transformations ●Back-propagation transforms from monitored data to models ●Task 2.4 – Change-impact analysis ●Analysis techniques to predict impact of proposed changes to a model ●Use detailed information from monitoring when available ●Use abstract information from models that have not yet been implemented

7 WP2 Tasks ●Task 2.5 – Model-driven toolset for evolutionary development ●Provides the final toolsuite delivered by DECISIVE ●Integrates results from Tasks 2.1-2.4 and results from WP3, WP4, and WP5.

8 WP2 Deliverables ●D2.1 – DECISIVE modeling language and editor ●v 0.1 – M6 – Tech report ●v 1.0 – M12 – Usable tool ●D2.2 – Transformation and analysis tools ●v 0.1 – M12 – Tech report ●v 1.0 – M18 – Implemented tools ●D2.3 – DECISIVE IDE ●v 1.0 – M24 – First integrated version. To be used in demonstrators. ●v 2.0 – M36 – Updated version. Based on feedback from demonstrators

9 WP2 Partners ●Austria ●CISC24 ●NXP28 ●Denmark ●DTU16 ●Finland ●NSN36 ●UoO20 ●VTT12 ●France ●Atego40 ●CEA30 ●Germany ●NXP24 ●Italy ●CRF12 ●Latvia ●CG4 ●LDZ6 ●Netherlands ●Almende12 ●OCE4 ●TUE8 ●Spain ●Integrasys7 ●Mondragon30 ●Sweden ●??


Download ppt "WP2 Planning per 2011-05-27. Objectives of WP2 ●Definition of multi-faceted component-model with support for ●Expressiveness for non-functional attributes."

Similar presentations


Ads by Google