Download presentation
Presentation is loading. Please wait.
Published byJoleen Barton Modified over 8 years ago
1
SIE_Ilo_A1 Austria Session 3 – Block 2 Barcelona 12-15 May 2003 SIEMENS 1 ON-LINE ESTIMATION AND LOCATION OF NON-TECHNICAL LOSSES IN A DISTRIBUTION SYSTEM A. ILO, J. Koppensteiner, M. Reischböck Siemens R. Cespedes KEMA Consulting P. Parra, H. Socorro, L. Rodriguez, T. Romero ENELVEN
2
SIE_Ilo_A1 Austria Session 3 – Block 2 Barcelona 12-15 May 2003 SIEMENS 2 Losses Technical Losses Thermal power generated in the system elements during normal operation. Non-technical losses Defective/incorrect metering Human errors on installation Theft
3
SIE_Ilo_A1 Austria Session 3 – Block 2 Barcelona 12-15 May 2003 SIEMENS 3 Revenue lost Technical Losses 3-6% Non-technical losses Mexico 10-20% South America 10-16 % India 20 – 40 % USA 0.5-3.5% (but $1 – and $10 – billion)
4
SIE_Ilo_A1 Austria Session 3 – Block 2 Barcelona 12-15 May 2003 SIEMENS 4 What can be done ?
5
SIE_Ilo_A1 Austria Session 3 – Block 2 Barcelona 12-15 May 2003 SIEMENS 5 Distribution Management System in combination with meter readings tracks down week points
6
SIE_Ilo_A1 Austria Session 3 – Block 2 Barcelona 12-15 May 2003 SIEMENS 6 ON-LINE ESTIMATION AND LOCATION OF NON-TECHNICAL LOSSES IN A DISTRIBUTION SYSTEM Read Meters (billed energy) Different day of months Different periodicity Technical losses Calculated from on-line power flow
7
SIE_Ilo_A1 Austria Session 3 – Block 2 Barcelona 12-15 May 2003 SIEMENS 7 Non-technical losses SCADA Meters Read meters (billed energy) Technical losses
8
SIE_Ilo_A1 Austria Session 3 – Block 2 Barcelona 12-15 May 2003 SIEMENS 8 Non-technical losses Non-Technical losses in feeder level EBI 10.09.02 – 16.10.02 Feeder Name Non-Technical losses Eval. Days (EBI days) Transformer list [kWh][%] Alparos 54872336 (36) Tereal 53002535 (36) Helui 49002136 (36)
9
SIE_Ilo_A1 Austria Session 3 – Block 2 Barcelona 12-15 May 2003 SIEMENS 9 Non – technical losses Distribution transformers with highest non-technical losses. Feeder: Alparos EBI 10.09.02–16.10.02 Distribution transformer name (TA) Non-technical losses [kWh][%] alpa/24ds/traf1 759 3.2 alpa/24ds/traf2 6172.6 alpa/24ds/traf36012.5
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.