Download presentation
Presentation is loading. Please wait.
Published byMithun Majumdar Modified over 8 years ago
1
Project monitoring plan Execution can not properly unless the project is monitored care fully Monitoring requires measurements to be made access the situation
2
Measurement The basic purpose of measurements in a project is to effectively monitor and control the project Measurements that are need in monitoring are project schedule metrics Size Effort Defects
3
Project monitoring and tracking The main goal of monitoring is for project managers to get visibility into the project execution so that they can determine whether any actions needs to be taken to ensure that the project goals are meet
4
Three main levels of monitoring are Activity level Status reporting Milestone analysis
5
s
6
Thanks a lot every attendee
7
Presentation on project monitoring Given by Mithun Majumdar IT/14/40
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.