Puget Sound Area Transmission Expansion Plan Sensitivity Results Review 5-14-2010
2
Overview Covington Transformer Sensitivity ◦ No 500 kV Bus NODO ◦ Option 8 One Transformers ◦ Option 8 Two Transformers All Lines In Service & 2850 MW Transfer ◦ Major Projects Without Bothell – SnoKing – Maple Valley Bothell – SnoKing – Maple Valley Rebuild Sensitivities ◦ Lakeside Transformer Project Rebuild the two 115kV lines between Sammamish-Lakeside-Talbot to double circuit 230 kV, add a single 230/115 kV transformer at Lakeside, Tap Bothell – Sammamish Line into SnoKing and rebuild Bothell-SnoKing 230 kV Lines ◦ Bothell – SnoKing – Maple Valley High Temp Wire No RAS ◦ Bothell – SnoKing – Maple Valley High Temp Wire With RAS ◦ 2 nd Monroe – Echo Lake Line & Bothell – SnoKing Rebuild ◦ 2 nd Monroe – Echo Lake Line & Bothell – SnoKing High Temp Wire ◦ No SnoKing – Maple Valley Rebuild ◦ SnoKing – Maple Valley High Temp Wire TCRM Limitations for Major Projects Case Future ATC Runs
3
Major Projects Note: The Sedro Transformer Project was on the Major Project list in the last version of the report. It has been added to the base case as an assumed project.
5
Covington Transformer Sensitivity Covington Transformer Project Without 500 kV Covington Bus ◦ Covington Transformer #5 Accounts for a Large Amount of Remaining WSN TCRM
7
NODO Transformer Sensitivities Option 8 With Cable Reactors Option 8 With Cable Reactors and 2 nd NODO Transformer
9
NODO Transformer Sensitivities Option 8 With Cable Reactors ◦ Increased SN TCRM Values Attributed to NODO 230/115 kV Transformer Option 8 With Cable Reactors and 2 nd NODO Transformer ◦ Increased SN TCRM Values Attributed to Canal – NODO 115 kV Line Add Reactors to Canal – NODO & Broad Street - NODO115 kV Lines
10
2850 MW Transfer Sensitivities Intertie NS Rated Capability (2850 MW) ◦ All Lines In Service ◦ Major Projects Without Bothell – SnoKing – Maple Valley Rebuild
12
2850 MW Transfer Observations Base Case Limitations ◦ SNS Seattle 115 kV Cables Portal Way Transformer ◦ SSN Seattle 115 kV Cables Custer – Monroe 500 kV Line ◦ WNS Portalway Transformer ◦ WSN Covington 500/230 kV Transformer Base Case With SCL Reactors Shows Little Benefit due to Limitations Seen on Bothell – SnoKing 230 kV Lines Major Projects Case Without the Bothell – SnoKing – Maple Valley Rebuild Shows Limitations on Bothell – SnoKing – Maple Valley Lines All Significant Limitations are Addressed by Major Projects Except Custer Monroe 500 kV Line
13
Bothell – SnoKing - Maple Valley Rebuild Sensitivities Lakeside Transformer Project ◦ Rebuild the two 115kV lines between Sammamish-Lakeside-Talbot to double circuit 230 kV, add a single 230/115 kV transformer at Lakeside, Tap Bothell – Sammamish Line into SnoKing and rebuild Bothell-SnoKing 230 kV Lines
15
Observations For Bothell – SnoKing – Maple Valley 230 kV Line Rebuild Alternatives Lakeside Transformer Project ◦ Valid Alternative ◦ Spread out TCRM Reduction Among Remaining Limiting Elements
16
Bothell – SnoKing - Maple Valley Rebuild Sensitivities Bothell – SnoKing – Maple Valley High Temperature Wire With Bothell – SnoKing RAS Without Bothell – SnoKing RAS 795 ACCR @ 207 deg Operation 1739 Amps, 693 MVA
18
Observations For Bothell – SnoKing – Maple Valley 230 kV Line Rebuild Alternatives Bothell – SnoKing – Maple Valley High Temperature Wire ◦ TCRM Increase Attributed to Limitations on Bothell – SnoKing – Maple Valley Lines Typical Outage Combination No RAS Primary: Multiple Secondary: L_BOTHELL230-SNOKS1230C1-MS Typical Outage Combination With RAS Primary: RAVER 500 - SCHULTZ 500 Secondary: N-2: CHIEF JO-MONROE 500 & CHIEF JO- SNOHOMISH 345 #3
19
Bothell – SnoKing - Maple Valley Rebuild Sensitivities 2 nd Monroe – Echo Lake 500 kV Line ◦ With Bothell – SnoKing Rebuild ◦ With Bothell – SnoKing High Temp Wire
21
Observations For Bothell – SnoKing – Maple Valley 230 kV Line Rebuild Alternatives 2 nd Monroe – Echo Lake 500 kV Line With Bothell – SnoKing Rebuild With Bothell – SnoKing High Temp Wire ◦ Valid Alternatives ◦ Spread out TCRM Reduction Among Remaining Limiting Elements ◦ Limitations to Bothell – SnoKing Lines Remain for High Temp Wire Option
22
Bothell – SnoKing - Maple Valley Rebuild Sensitivities SnoKing – Maple Valley Alternatives ◦ No SnoKing – Maple Valley Rebuild ◦ SnoKing – Maple Valley High Temp Wire
24
Observations For Bothell – SnoKing – Maple Valley 230 kV Line Rebuild Alternatives No SnoKing – Maple Valley Rebuild ◦ SnoKing – Maple Valley Limitations Attribute Majority of TCRM increase SnoKing – Maple Valley High Temp Wire ◦ Valid Alternative ◦ Low TCRM Levels Remain for SnoKing – Maple Valley Lines
25
TCRM Limitations for Major Projects Case Elements With TCRM Levels Over 1000 for Major Projects Case ◦ WSN Snohomish 230/345 kV Transformer #1 TCRM = 8703 PTDF ≈ 3.5, OTDF ≈ 6.6 Mercer Island Tap – Shuffleton 115 kV Line TCRM = 6550 PTDF ≈ 0.95, OTDF ≈ 3.6 Everett – Navy 115 kV Line TCRM = 5771 PTDF ≈ 0.85, OTDF ≈ 2.35 Murray – Snohomish 230 kV Line TCRM = 3087 PTDF ≈ 4.4, OTDF ≈ 16.7 Delridge – Duwamish 230 kV Line TCRM = 2588 PTDF ≈ 1.1, OTDF ≈ 2.0 ◦ Comments
26
Planned ATC Runs North Downtown Substation with Reactors on Canal – NODO & Broad Street – NODO Lines Rerun All Runs With Rating Corrections to 500-230 kV Transformers in Puget Area From BPA – ColumbiaGrid Meeting ◦ Upgrade SCL Cables ◦ Third SCL Cable ◦ 500 kV Loop Option With 230 kV Maple Valley – SnoKing Line Suggestions?