Universal Current Meter Training Model OSS-B1 Hydrological Services Pty Ltd Available for rent from Tech-Rentals.

Similar presentations


Presentation on theme: "Universal Current Meter Training Model OSS-B1 Hydrological Services Pty Ltd Available for rent from Tech-Rentals."— Presentation transcript:

1 Universal Current Meter Training Model OSS-B1 Hydrological Services Pty Ltd Available for rent from Tech-Rentals

2 Section 1 Prior To Discharge Measurements

3 Prior To Discharge Measurements ● Open the case and pick up the Fan assembly ● Turn Fan Carrier Anti-Clockwise Anti- Clockwise

4 Prior To Discharge Measurements ● Remove fan carrier and shaft assembly (do not put it down anywhere it may attract dirt particles) ● Hold the fan upright and ¾ filling as shown in figure Use Lint Free Tissue

5 Prior To Discharge Measurements ● Replace axle and fan carrier, excess oil will be forced up through the capillary gap around the axle, ensure fan carrier is tightened ● Wipe the excess oil of the meter using lint free paper towel Clockwise

6 Prior To Discharge Measurements ● Do not forget to close the oil bottle straight after usage to avoid contamination of the oil ● Slide the fan assembly into the body and use the stubby screwdriver to tighten the retaining screw to lock the fan assembly in place

7 Prior To Discharge Measurements ● Prior to spin test hold the current meter in the horizontal position and spin by hand for approx. one minute to get rid of the hydraulic pressure ● Spin test the meter against time. This is required to test the performance of the shaft and bearings

8 Prior To Discharge Measurements ● Spin test results are dependent on the fan type Time (sec)Fan No. Minimum 90 sec4 2 Minimum 110 secA Minimum 90 sec1 OSS-B1 Spin Test

9 Prior To Discharge Measurements ● After the spin test is performed connect your current meter to the counter using the lead, this important to test the lead, reed switch and counter.

10 Section 2 During and after Discharge Measurements

11 During and after Discharge Measurements ● After every discharge measurement, or one hour of use the current meter should be cleaned and refilled with oil, if continuing a discharge measurement.

12 During and after Discharge Measurements ● Undo the cleaning jar cap and ¾ filling with white spirit ● Remove fan assembly from meter body by undoing the retraining screw and separating the body from the fan Cleaning Jar

13 During and after Discharge Measurements ● Remove fan carrier and shaft assembly (do not put it down anywhere it may attract dirt particles) ● Empty the old oil in a recycling container (do not tip oil on the ground this will pollute the environment)

14 During and after Discharge Measurements ● Put the shaft and bearing assembly into the cleaning jar. ● Agitate them ● Fill up the fan with white spirit put your thumb in place of carrier and shake it really hard for a few seconds.

15 During and after Discharge Measurements ● Blow dry the shaft assembly, fan carrier and fan. ● Re-assemble the fan, if discharge measurement is finished

16 During and after Discharge Measurements ● Wipe box clean and return the fan assembly to the case ● If continuing a discharge measurement, Refill the fan with oil

17 During and after Discharge Measurements ● Spin test the current meter against time as shown in section 1 ● After the spin test is performed connect your current meter to the counter using the lead, this important to test the lead, reed switch and counter.

18 Section 3 Office Cleaning

19 Office Cleaning Office cleaning should be performed on a monthly basis or whenever the meter is dirty and require a good cleaning to put it back in operation

20 ● Dismantle Fan Carrier and shaft assembly from from Anti- Clockwise Office Cleaning

21 ● Separate Fan Carrier (1) From Shaft assembly (2) 12 Office Cleaning

22 ● Dismantle Shaft as shown in the figure ● Follow the images in sequence Office Cleaning

23 Remove Nut Remove Bearing Office Cleaning

24 Remove Outer SpacerRemove Inner Spacer Office Cleaning

25 Remove Bearing Fan assembly fully dismantled ready to clean Office Cleaning

26 Place in Sink Ready to Clean, Soak for at least 5 minutes Start Cleaning Office Cleaning

27 Cleaning FanCleaning Fan Carrier Office Cleaning

28 Cleaning Outer Spacer Rinse full assembly with Tap Water Office Cleaning

29 ● Place Full Assembly on a Lint Free Tissue ● Ready to dry and Re- assemble. Office Cleaning

30 Dry Fan Carrier Office Cleaning Dry Fan

31 Office Cleaning Dry Outer Spacer Dry Inner Spacer Office Cleaning

32 Blow Dry Bearing & Nut Office Cleaning

33 Start Shaft Assembly, Bearing First Assemble Inner Spacer Office Cleaning

34 Assemble Outer SpacerAssemble Bearing

35 Assemble Axle Nut Dip Shaft Assembly in White Spirit To lubricate bearings Office Cleaning

36 Blow Excess White Spirit Assemble Axle With Fan Carrier Office Cleaning

37 ● Assemble Fan and Place In Carry Case. For The Next Field Trip Clockwise Office Cleaning

38 Section 4 Calibration

39 Calibration ● Recalibrate the current meter every 300 hours of use or once a year which ever comes first (see Hydrological Services calibration certificate for details) ● For recalibration only, send the body and the fans that require calibration (to save weight). However, if other items needs repair they can be sent with the body and fans. Note: Hydrological Services provides a recalibration and repair service for all types of current meters.

40 O-ring replacement The following image shows the locations of the various O rings require to provide an adequate water seal in the system.


Download ppt "Universal Current Meter Training Model OSS-B1 Hydrological Services Pty Ltd Available for rent from Tech-Rentals."