Download presentation
Presentation is loading. Please wait.
Published byStewart Cole Modified over 8 years ago
1
MWT Assignment U&I Communications Group Leader: Ngik Soon Teck Group Member: Tan Ming Fatt Adi Kelera Anish Kumar
2
Introduction U&I Company is a newly established telecommunication company Intends to open 10 branches Create a wireless technology for the communication between the branches and headquarters
3
Requirement Analysis First stage of system engineering process includes site survey, interview and observation Interview is used for gathering information Observation is used led to some most important discoveries Site Survey is used for asking public people like users or customers
4
Research and development Most commonly used connection are wired and wireless Wireless local-area network uses radio waves to connect WLAN advantages Mobility Easy to setup Reduce cost to add new user Wired disadvantages Occupy places to set up wire route Connection to devices are fixed Add cost for new user
5
Broadband is having the wireless feature Wireless broadband able to handle high speed internet access without cables Wireless made a lot of changes to current working style Wireless have developed modem and router for wireless feature Modem High speed internet access Measured by bit rate Have different connection groups Router Combining access point, switch and router Able to track all the queries to the internet Have a network firewall
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.