Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Items 6D & 6E ZA & ZA OWNERS:Timothy & Lori Livingston and James.

Similar presentations


Presentation on theme: "1 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Items 6D & 6E ZA & ZA OWNERS:Timothy & Lori Livingston and James."— Presentation transcript:

1 1 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Items 6D & 6E ZA07-070 & ZA07-071 OWNERS:Timothy & Lori Livingston and James Arca APPLICANT:Four Peaks Development Company REQUEST:ZA07-070: Second reading for Zoning Change & Concept Plan from “AG” Agricultural District and “S-P-1” Detailed Site Plan District to “SF-20A” Single Family Residential District for Woodbury Addition, a 9-lot cul-de-sac development on approximately 5.735 acres. The application as presented has been amended since its consideration at the August 9 Planning & Zoning Commission meeting. ZA07-071: Preliminary Plat for Woodbury Addition LOCATION:The properties are located at 2020 and 2030 W. Continental Boulevard, near the northeast corner of W. Continental Blvd and Davis Blvd (FM 1938).

2 2 Integrity Innovation Accountability Commitment to Excellence Teamwork Values

3 3 Integrity Innovation Accountability Commitment to Excellence Teamwork Values

4 4 Integrity Innovation Accountability Commitment to Excellence Teamwork Values

5 5 Integrity Innovation Accountability Commitment to Excellence Teamwork Values

6 6 Integrity Innovation Accountability Commitment to Excellence Teamwork Values W. Continental Blvd Davis Blvd (FM 1938) COUNTRY WALK KOALATY PARK SOUTHLAKE WOODS NORTH DAVIS BUSINESS PARK

7 7 Integrity Innovation Accountability Commitment to Excellence Teamwork Values View looking north toward property

8 8 Integrity Innovation Accountability Commitment to Excellence Teamwork Values View looking east toward property

9 9 Integrity Innovation Accountability Commitment to Excellence Teamwork Values View looking south toward property

10 10 Integrity Innovation Accountability Commitment to Excellence Teamwork Values

11 11 Integrity Innovation Accountability Commitment to Excellence Teamwork Values ZA07-070 Original PlanAmended Plan Gross Acreage6.68 acres5.735 acres Net Acreage5.58 acres4.788 acres Area of ROW1.095 acre0.947 acre Number of Lots 11 Residential 1 Open Space 9 Residential Gross Density1.65 du/acre1.57 du/acre Net Density1.97 du/acre1.88 du/acre Avg Lot Size 0.49 acre 21,428 sq. ft. 0.53 acre 23,178 sq. ft. Overall Site Data

12 12 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Original Concept Plan

13 13 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Original Concept Plan Variance to Sidewalk Requirement along W. Continental Blvd requested Applicant proposed 4-foot sidewalk connection Variance to 50’ ROW Requirement for local streets requested (40’ provided)

14 14 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Amended Concept Plan

15 15 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Amended Concept Plan Variance to 50’ ROW Requirement for local streets requested (40’ provided) Sidewalk provided along entirety of W. Continental Blvd frontage as well as voluntary connection to Deer Hollow Blvd (no variance requested)

16 16 Integrity Innovation Accountability Commitment to Excellence Teamwork Values

17 17 Integrity Innovation Accountability Commitment to Excellence Teamwork Values

18 18 Integrity Innovation Accountability Commitment to Excellence Teamwork Values

19 19 Integrity Innovation Accountability Commitment to Excellence Teamwork Values

20 20 Integrity Innovation Accountability Commitment to Excellence Teamwork Values

21 21 Integrity Innovation Accountability Commitment to Excellence Teamwork Values

22 22 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Existing Sidewalks Multi-Use Trail 8’+ (Planned) Sidewalks <8’ (Planned) 2005 Pathways Plan

23 23 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Area of proposed off-site sidewalk installation

24 24 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Original Tree Conservation Plan 26% 60%66%

25 25 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Amended Tree Conservation Plan 28% 60%68%

26 26 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Amended Tree Conservation Plan 28% 60%68%

27 27 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Area of Drainage Detention

28 28 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Items 6D & 6E ZA07-070 & ZA07-071 P&Z ACTION:ZA07-070: August 9, 2007; Approved (5-1) subject to Concept Plan Review Summary No. 3, dated August 3, 2007; denying the requested variance to the sidewalk requirement along W. Continental Blvd; approving the requested variance to 50’ street width requirement with the exception to the cul-de-sac; and noting the applicant will obtain a letter of approval from the Fire Marshall regarding the undersized cul-de-sac. ZA07-071: August 9, 2007; Approved (5-1) subject to Plat Review Summary No. 3, dated August 3, 2007; with the same stipulations stated in the zoning - denying the requested variance to the sidewalk requirement along W. Continental Blvd; approving the requested variance to 50’ street width requirement with the exception to the cul- de-sac; and noting the applicant will obtain a letter of approval from the Fire Marshall regarding the undersized cul-de-sac.

29 29 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Items 6D & 6E ZA07-070 COUNCIL ACTION: August 21, 2007; Approved first reading (7-0) noting the pond will be detention, internal to the subdivision, with masonry fencing, requiring masonry fencing along the rest of the subdivision, allow developer to bring in other options, granting variance, subject to Concept Plan Review Summary No. 4, dated August 15, 2006.

30 30 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Questions?

31 31 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Public Works Presentation

32 32 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Original Utility Plan – No Amended Plan Submitted Existing 6” sanitary sewer Existing 12” water line Existing 10” sanitary sewer

33 33 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Drainage Plan

34 34 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Questions?


Download ppt "1 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Items 6D & 6E ZA & ZA OWNERS:Timothy & Lori Livingston and James."

Similar presentations


Ads by Google