1 The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement 284404. HL-LHC Vacuum Technical Meeting WP12 Lucio Rossi 6 March 2014 @ CERN

2 2 The CERN 10-year plan (approved early 2011) LRossi@TechMeet VAC - CERN 6March2014 0.75 10 34 cm -2 s -1 50 ns bunch high pile up  40 1.5 10 34 cm -2 s -1 25 ns bunch pile up  40 1.7-2.2 10 34 cm -2 s -1 25 ns bunch pile up  60 Technical limits (experiments, too) like : EYETSEYETS EYETSEYETS LS2 LS3 Plan modification approved Dec 2013

3 3 2013: HL-LHC: from Design Study to Construction Project (funded) LRossi@TechMeet VAC - CERN 6March2014 c) Europe’s top priority should be the exploitation of the full potential of the LHC, including the high-luminosity upgrade of the machine and detectors with a view to collecting ten times more data than in the initial design, by around 2030. This upgrade programme will also provide further exciting opportunities for the study of flavour physics and the quark-gluon plasma. Update of 2013 Approved at special CERN Council Held in Brussels 30 May 2013 Update of 2013 Approved at special CERN Council Held in Brussels 30 May 2013

4 4 Review of LHC & Injector Upgrade Program (CERN-MAC) LRossi@TechMeet VAC - CERN 6March2014 Recommendation (R1): The committee supports the full LHC high luminosity program (HL-LHC), including the full LHC Injector Upgrade (LIU) project and the Upgrade Scenarios 1 and 2, and recommends scheduling LS3 for the installation of all necessary equipment for the HL-LHC as early as possible to maximize the integrated luminosity of the LHC. Flull plan (incl. CC and LRBBW): OK

5 5 Project Kick off meeting on 11 Nov 2013 LRossi@TechMeet VAC - CERN 6March2014

6 FP7 EuCARD HiField Dip LARP generic FP6 CARE Nb3Sn DOE Nb3Sn R&D LARP HiField quads LARP Demo FP7 sLHC PP (INJ) sLHC INJ implem. FP7 DS Hi-Lumi LHC Constr uction M Injector upgrade HL-LHC commissioning 2000 2005 2010 2015 2023 CERN- KEK R&D CERN- KEK D1 design The HL-LHC project formally started in 2010; however it is the focal point of 20 years of converging International Collaboration today 6 Collaboration: the long way LRossi@TechMeet VAC - CERN 6March2014

7 7 In-kind contribution and Collaboration for design and prototypes: Vacuum best practice enforced! LRossi@TechMeet VAC - CERN 6March2014 Q1-Q3 : R&D, Design, Prototypes and in-kind USA D1 : R&D, Design, Prototypes and in-kind JP MCBX : Design and Prototype ES HO Correctors: Design and Prototypes IT Q4 : Design and Prototype FR Q1-Q3 : R&D, Design, Prototypes and in-kind USA D1 : R&D, Design, Prototypes and in-kind JP MCBX : Design and Prototype ES HO Correctors: Design and Prototypes IT Q4 : Design and Prototype FR CC : R&D, Design and in-kind USA CC : R&D and Design UK ATLAS CMS

8 8 This goal woudl be reached by 2035-36 LRossi@TechMeet VAC - CERN 6March2014 What to do, to make this jump ? M. Lamont, CERN

9 Vacuum: touch all WPs WP2 : e-cloud WP3 : cryostat vac, beam pipe, beam screen (and e-cloud); Test facilities WP4 : cryomodule and beam pipe; Test facilities and assembly facilities WP5 : collimators vacuum issue; e-lens?; Crystal? WP6 : cryostat of SC links WP8 : machine-experiment interface (vacuum lay-out) WP9 : Cryogenic equip. vacuum WP7 & W10: UFOs… WP11: 11 T cryostat and by-pass + collimators WP12: self-coupling ? WP13: beam diagnostic related? WP14: Kickers WP15 : integration - Installation 9 LRossi@TechMeet VAC - CERN 6March2014

10 10 Implementation plan (BEFORE 1 year shift of the LS3  2023-24) All WP active, from diagnostics to Machine Protection; Integration started with vigour as well as QA (workshop soon) Cryo, SC links, Collimators, Diagnostics, etc. starts in LS2 (2018-19) Proof of main hardware by 2016; Prototypes by 2017 Start construction 2017/18 from IT, CC, other main hardware IT String test (integration) in 2019-20; Main Installation 2022-23 2023-24 Though but – based on LHC experience – feasible Cost: 810 MCHF (Material, CERN accounting) All WP active, from diagnostics to Machine Protection; Integration started with vigour as well as QA (workshop soon) Cryo, SC links, Collimators, Diagnostics, etc. starts in LS2 (2018-19) Proof of main hardware by 2016; Prototypes by 2017 Start construction 2017/18 from IT, CC, other main hardware IT String test (integration) in 2019-20; Main Installation 2022-23 2023-24 Though but – based on LHC experience – feasible Cost: 810 MCHF (Material, CERN accounting) LRossi@TechMeet VAC - CERN 6March2014 Most already in CERN plan: counting on the USA and JP contribution we are basically covered

11 The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement 284404. Have a useful and productive Meeting! … and do not ask the Moon: even in HiLumi resources are limited and must be optimzed!