Download presentation
Presentation is loading. Please wait.
Published byJack Bridges Modified over 8 years ago
1
GCOS Progress Report and “GCOS IP” Update Paul Mason, Stephan Bojinski GCOS Secretariat, WMO
2
Progress Report Overview and Action by Action statement of progress l Acknowledging that progress almost entirely due to national and partner organisation actions l Explicitly recognising some clear responses as examples but being careful to mention wider community involved l Encouraging progress with the many actions that have made partial progress l Honest but diplomatic re absence of action or changed GCOS goals l Not overly lengthy e.g. 30 pages and at least the executive summary to be aimed at UNFCCC, WMO etc delegates
3
Progress Report Writing strategy l Main drafting by Panel chairs and representatives of partner observing systems GOOS, GTOS, and WMO through GCOS secretariat l Dealing with gaps in knowledge by email/telephone and use a few selected experts and the IP update team for initial review l Submitted to SBSTA while a completed draft and under open review l Finalised Summer 2009.
4
GCOS IP update l An update (not a rewrite) but making corrections, and providing extra detail where it is lacking l Incorporate much of satellite supplement (probably with very minor alteration) l More specific re Atmospheric composition, and Cryosphere but distinguishing between “continuous” global and decadal measurement needs, and mentioning supporting research observation needs l Aiming to include regional adaptation needs for ECV’s and raise needs for observations that will help link impacts to physical climate l Under detailed partner consultation and open review along side progress report.
5
Progress Report Writing strategy l Main drafting by Expert drafting team of about 30 meeting once then by emails. l Jim Rasmussen editor l Follow on with just chairs plus experts and partners according to need l Length of IP will increase only to the extent essential to new details l Submitted to SBSTA while a completed draft and under open review l Finalised Summer 2009.
6
Timeline: ActionTime Period Call to Parties for additional submission by 15 Sep 083 April 2008 1 st meeting; Outline of Progress Report30 June – 2 July 2008 1 st drafting periodJuly – 15 September 2008 Assessing progress against GIP Synthesis of Parties’ additional submissions Initialized, ongoing; 15 Sep – Nov 2008 2 nd meeting24-26 November 2008 (27 Nov: PM, JR) Draft v1.0 of Progress Report20 January 2009 Expert meeting on Update of the GIP2-5 February 2009 Progress Report: Draft v2.015 March 2009 Closure Meeting (Editor, Chair(s), Secretariat)2 nd half of March 2009 Final copy editing (Editor)1-15 April 2009 Submission of Final Draft to UNFCCC Sec15 April 2009 Final Draft Open Review1 May – 20 June 2009/until after SBSTA-30 Finalize Reportby 1 July 2009 Update GIP: Draft v1.01 March 2009 Work on Draft at Closure Meeting2 nd half of March 2009 Draft v2.01 May 2009 Draft v2.0 Open Review1 May – 20 June 2009/until after SBSTA-30 Finalize ReportBy 15 July 2009
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.