1 T600 Detector Installation @ FNAL Fernanda G. Garcia (fgarcia@fnal.gov)fgarcia@fnal.gov Fermi National Accelerator Laboratory

2 Overview on Detector Installation Detector Civil Construction –Structure steel work - Concrete pour –Forming for loading dock level pour –Beneficial Occupancy of detector enclosure –negotiating mid-August’16 fgg / 2 April 13, 2016

3 Overview on Detector Installation Installation of T600 detector in the detector hall Request for a budgetary quotation document is complete Plan in a nutshell: 1.Rigging contract to install the T600 with one 30-ton crane which contractor can use 2.Rigging contract to install the T600 with two 30-ton crane which contractor can use Meeting with FNAL procurement Procurement department will take the lead on sending out the request to possible contractors and follow up on the process fgg / 3 April 13, 2016

4 Overview on Detector Installation Warm vessel - floor Mechanical support group working on analyzing options on how to assemble the the warm vessel Warm vessel floor (ref. https://indico.cern.ch/event/505904/) Assemble at the detector hall – flip 180 o long edge fgg / 4 April 13, 2016

5 Overview on Detector Installation Warm vessel - walls Mechanical support group working on analyzing options on how to assemble the the warm vessel Warm vessel walls (ref. https://indico.cern.ch/event/518544/) fgg / 5 April 13, 2016 Assembly at Minos Service Building

6 Overview on Detector Installation fgg / 6 April 13, 2016 Advantages : Wall sub-assembly weldments can be fabricated in parallel to floor Wall sub-assembly weldments can be assembled prior to obtaining beneficial occupancy. Multiple wall panel weldment can be simultaneously assembled at M.S.B. flat on the floor. No transport frame required, weldment will fit through the SBN-FD roll up door flat on a flatbed. Half as many vertical field welds Disadvantages : Dimensional stack ups could create issues when trying to fit the last pieces & the corresponding roof pieces. We would have to obtain permission to use the M.S.B.

7 Overview on Detector Installation fgg / 7 April 13, 2016 Electrical System – Grounding (ref. https://indico.cern.ch/event/518544/)https://indico.cern.ch/event/518544/

8 Overview on Detector Installation fgg / 8 April 13, 2016 CRT Current design request a space of ~10 cm under the warm vessel Engineer design current on holding pattern until agreement on the spacing underneath the detector is further discussed with experts Concrete basement Concrete Island Metallic structure Metallic foot 10 cm

9 Overview on Detector Installation fgg / 9 Transportation Gathering information about transportation rules Compile a list of equipment that needs to be shipped to FNAL Work with FNAL international freight broker to guide us through this process Classify the items for commerce control list classification Current identified a point of contact at CERN to work with FNAL Mike Dinnon on the transportation logistics issues April 13, 2016