Download presentation
Presentation is loading. Please wait.
Published byWilliam Heath Modified over 8 years ago
1
Presented by Anil Deshmukh (Msc Agri) AGRI SMART Murli-Shakuntal (Kesekar Complex ) Ist Floor, North Bldg., In front of Market Yard, Sangamner Dist. A'Nagar. Ph. (02425) 224399. E-mail : agrismart@yahoo.com
2
Name of Scheme: Development of Commercial Horticulture Through Production and Post Harvest Management. Agency: National Horticulture Board, Gurgaon, New Delhi. Regional Offices :- Pune, Nasik, Nagpur Subsidy: 40% of Project cost. Back ended subsidy. Loan Amount: Minimum 60% and Maximum 75 % of the Project cost Limit of cost / project – up to 75 Lakh Minimum land –above 5 acre ANNEXURE VII.docx
3
Pomegranate – 5.20 Acres Pomo Cost – 185000 Total Project Cost 962000 (TPC) Loan amt(LA)75% 721500 Margin 25% 240500 NHB SBD 40% 384800(i.e.74000/acre Drip Automation & Mechanization Extra Vermi compost & Mulching Paper Extra
4
Land Development :- Land clearance, Bunding, Soil preparation, Pits Digging, Fencing(Barbed, Live, Chain Link, Solar) Road-Main Road & Internal Roads. Plantation :- Planting Material, Fertilizers, pesticides, Labor charges. Irrigation Infrastructure :- Water storage tank(farm Pound), Overhead Water tank, PVC Pipe line, Electric Motor, Engine, DG Set. Drip Irrigation :- Sprinkler Irrigation,Rain Gun. Plastic Mulching :- Mulching Paper Civil Infrastructure :- Labor Quarter, Storage room, Packing Shed,Vermi Compost Shed Automation & Mechanization :- Drip Automation, Tractor, Brush Cutters, ESS(Electrostatic Spray ) Blower. Tools & Implements, Rotavator,
5
Survey Planning Project report Submission to bank and NHB LOI from NHB Bank disbursement 50 % (100% Subsidy Release) Project completion report to NHB Inspection by JIT(NHB, Bank, Agri Dept.) Finalization of subsidy by NHB to Bank
6
Project upto 10 Lacs – Rs. 1000.00 10 to 20 Lacs -- Rs. 2000.00 20 to 50 Lacs -- Rs. 5000.00 Above 50 Lacs -- Rs. 10000.00 Validity of LOI – 2 Years In favour of - Managing Director, National Horticulture Board. Payable at—Gurgaon.
7
7/12, 8A. ID Proof & Residence Proof. Bank letter with outward no. and code no. of branch. Passport size photograph of all the promoters. Demand Draft for processing fees
9
Pomegranate-185000 Grapes - 355000 Mango -150000 Santra -185000 Mosambi -185000 Gauva -150000 Mango -150000
10
Land 10% of EPC Land development 15% of EPC(MAX 50000/acre) Drip Irrigation 35000 Plantation Irrigation Infra 50000/acre Plastic mulching 12800/acre GAP 4000/acre Civil Structure 20000/acres Pack House 400000lac /unit Vermicompost 60000/unit
11
: AGRISMART Kesekar Complex, North building, 1 st floor, opp. Market Yard, Sangamner. Tal: Sangamner. Dist: Ahmednagar. (Maharashtra) Pin 422605. (02425) 224399 E-mail: – agrismart@yahoo.comagrismart@yahoo.com Contact Person: - Mr. Anil Deshmukh. 9850675999 Mr. Satish Pansare. 9373945000 Mr. Deepak Bhagwat. 9373947000
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.