INFORMATION SECURITY MANAGEMENT L ECTURE 3: P LANNING FOR C ONTINGENCIES You got to be careful if you don’t know where you’re going, because you might not get there. – Yogi Berra
2
Principles of Information Security Mgmt Include the following characteristics that will be the focus of the current course (six P’s): 1.Planning 2.Policy 3.Programs 4.Protection 5.People 6.Project Management http://csrc.nist.gov/publications/PubsTC.html Chapters 2 & 3 Chapter 4
3
Introduction One study found that over 40% of businesses that don't have a disaster plan go out of business after a major loss Small Business Approaches Additional Approaches
5
Introduction – 2012 Natural Disaster Map
6
Contingency Planning Contingency planning (CP) – The overall planning for unexpected events – Involves preparing for, detecting, reacting to, and recovering from events that threaten the security of information resources and assets
7
Fundamentals of Contingency Planning Incident Response Disaster Recovery Business Continuity
8
Developing a CP Document Develop the contingency planning policy statement Conduct the BIA Identify preventive controls Develop recovery strategies Develop an IT contingency plan Plan testing, training, and exercises Plan maintenance
9
Business Impact Analysis (BIA) Provides detailed scenarios of each potential attack’s impact
10
Business Impact Analysis (cont’d.) The CP team conducts the BIA in the following stages: – Threat attack identification – Business unit analysis – Attack success scenarios – Potential damage assessment – Subordinate plan classification What are the goals of a BIA? Management of Information Security, 3rd ed.
11
Business Impact Analysis (cont’d.) An organization that uses a risk management process will have identified and prioritized threats The second major BIA task is the analysis and prioritization of business functions within the organization Each should be categorized
12
Business Impact Analysis (cont’d.) Create a series of scenarios depicting impact of successful attack on each functional area Attack profiles should include scenarios depicting typical attack including: (1) Methodology, (2) Indicators, (3) Broad consequences Estimate the cost Should this be done in-house or outsourced?
13
NIST Business Process and Recovery Criticality Key recovery measures: Maximum Tolerable Downtime (MTD) - total amount of time the system owner is willing to accept for a mission/business process outage or disruption Recovery time objective (RTO) - maximum amount of time that a system resource can remain unavailable before there is an unacceptable impact on other system resources and processes Recovery point objective (RPO) - point in time, prior to a disruption or system outage, to which mission/business process data can be recovered after an outage
14
NIST Business Process and Recovery Criticality Work Recovery Time (WRT) - amount of effort that is necessary to get the business function operational AFTER the technology element is recovered Can be added to the RTO to determine the realistic amount of elapsed time before a business function is back in useful service Total time needed to place the business function back in service must be shorter than the MTD Must balance the cost of system inoperability against the cost of recovery
16
Timing and Sequence of CP Elements Management of Information Security, 3rd ed. Figure 3-6 Contingency planning implementation timeline Source: Course Technology/Cengage Learning
17
Incident Response Plan The question is not will an incident occur, but rather when an incident will occur A detailed set of processes and procedures that commence when an incident is detected When a threat becomes a valid attack, it is classified as an information security incident if it: directed against information assets a realistic chance of success threatens the confidentiality, integrity, or availability of information assets
18
Incident Response Plan (cont’d.) Who creates the incident response plan? Planners develop and document the procedures that must be performed during the incident and immediately after the incident has ceased Separate functional areas may develop different procedures
19
Incident Response Plan (cont’d.) Develop procedures for tasks that must be performed in advance of the incident – Details of data backup schedules – Disaster recovery preparation – Training schedules – Testing plans – Copies of service agreements – Business continuity plans
20
Incident Response Plan (cont’d.) Management of Information Security, 3rd ed. Figure 3-3 Incident response planning Source: Course Technology/Cengage Learning
21
Incident Response Plan (cont’d.) Planning requires a detailed understanding of the information systems and the threats they face The IR planning team seeks to develop pre-defined responses that guide users through the steps needed to respond to an incident
22
Incident Response Plan (cont’d.) Incident classification – Determine whether an event is an actual incident – Uses initial reports from end users, intrusion detection systems, host- and network-based virus detection software, and systems administrators (Example: RSA Data Loss Prevention)
23
Incident Response Software
24
Incident Response Plan Tools
26
Incident Response Plan: Indicators Possible indicators Probable indicators Definite indicators When the following occur, the corresponding IR must be immediately activated Loss of availability Loss of integrity Loss of confidentiality Violation of policy Violation of law http://www.npr.org/blogs/thetwo-way/2013/01/16/169528579/outsourced-employee-sends-own-job-to- china-surfs-web
27
Incident Response Plan (cont’d.) Once an actual incident has been confirmed and properly classified – IR team moves from the detection phase to the reaction phase – A number of action steps must occur quickly and may occur concurrently
28
Incident Response Plan: Action Steps 1. Notification of key personnel (alert roster) 2. Assignment of tasks 3. Documentation of the incident
29
Incident Response Plan (cont’d.) The essential task of IR is to stop the incident or contain its impact Incident containment strategies focus on two tasks:
30
IRP: Stopping the Incident Containment strategies Once contained and system control regained, incident recovery can begin Incident damage assessment An incident may increase in scope or severity to the point that the IRP cannot adequately contain the incident
31
IRP: Recovery Process Identify the vulnerabilities Address the safeguards that failed Evaluate monitoring capabilities (if present) Restore the data from backups as needed Restore the services and processes in use Continuously monitor the system Restore the confidence of the members
32
Incident Response Plan (cont’d.) When an incident violates civil or criminal law, it is the organization’s responsibility to notify the proper authorities Involving law enforcement has both advantages and disadvantages
33
Article: Incident Response – SANS Survey
34
Disaster Recovery Plan The preparation for and recovery from a disaster, whether natural or man made In general, an incident is a disaster when:
35
Disaster Recovery Plan (cont’d.) The key role of a DRP is defining how to reestablish operations at the location where the organization is usually located Common DRP classifications: Natural Disasters Human-made Disasters Scenario development and impact analysis – Used to categorize the level of threat of each potential disaster
36
Disaster Recovery Plan (cont’d.) Discussion on Disaster Recovery Myths
37
Dispelling 10 Common Disaster Recovery Myths: Lessons Learned from Hurricane Katrina and Other Disasters BRETT J. L. LANDRY University of Dallas AND M. SCOTT KOGER Western Carolina University
39
Common Myths to Avoid in Disaster Recovery Only Plan for Natural Disasters Mock Tests are not Enough External Threats are the only Attack on Resources Data Recovery Sites are Ready for a DR Employee Non-Working Areas are Adequately Equipped
40
Common Myths to Avoid in Disaster Recovery Implementing DR Testing at a Later Time for New Systems Replacement Equipment will be Available for DR During or After Back-up Data Works and can be Restored after DR DR can be Planned in Company Depts. Employees are Aware of what they Need to Do
41
Disaster Recovery Be a ‘Pessimist’ - (TV show Doomdayers) Plan, plan, and plan Multiple scenarios Have a Multitude of Backups and Contingencies Test – Scheduled and Unscheduled Keep DR Planning and Preparation as an Continuous Task
42
Beyond The Article Multitude of Vendors that help with DR Plans Put together a Disaster Recovery Team Document Everything have a Manual Personal Experiences https://www-01.ibm.com/support/knowledgecenter/ssw_ibm_i_71/rzarm/rzarmdisastr.htm http://www.sungardas.com/Documents/disaster-recovery-plan-template-SFW-WPS-086.pdf http://www.disasterrecovery.org/plan_steps.html
43
Disaster Recovery Plan (cont’d.) Discussion on Disaster Recovery Checklist
44
Business Continuity Plan Ensures critical business functions can continue in a disaster Activated and executed concurrently with the DRP when needed Relies on identification of critical business functions and the resources to support them
45
BCP: Strategies Continuity strategies
46
Business Continuity Plan:Site Options Hot Sites Warm Sites Cold Sites Other Alternatives: Timeshares, Service Bureaus, Mutual Agreements Ex. RSA data centers – lease 2 - 10gig Ethernet lines between MA and NC
47
Business Continuity Plan (cont’d.) To get any BCP site running quickly organization must be able to recover data Options include:
48
Timing and Sequence of CP Elements Figure 3-4 Incident response and disaster recovery Source: Course Technology/Cengage Learning
49
Timing and Sequence of BCP Source: Course Technology/Cengage Learning
50
Timing and Sequence of CP Elements Management of Information Security, 3rd ed. Figure 3-6 Contingency planning implementation timeline Source: Course Technology/Cengage Learning
51
Business Resumption Planning Because the DRP and BCP are closely related, most organizations prepare them concurrently
52
Business Resumption Planning (cont’d.) Components of a simple disaster recovery plan – Name of agency – Date of completion or update of the plan and test date – Agency staff to be called in the event of a disaster – Emergency services to be called (if needed) in event of a disaster
53
Business Resumption Planning (cont’d.) Components of a simple disaster recovery plan (cont’d.) – Locations of in-house emergency equipment and supplies – Sources of off-site equipment and supplies – Salvage priority list – Agency disaster recovery procedures – Follow-up assessment
54
Testing Contingency Plans Problems are identified during testing – Improvements can be made, resulting in a reliable plan Contingency plan testing strategies – Desk check – Structured walkthrough – Simulation – Parallel testing – Full interruption testing
55
Contingency Planning: Final Thoughts Iteration results in improvement A formal implementation of this methodology is a process known as continuous process improvement (CPI) Each time the plan is rehearsed it should be improved Constant evaluation and improvement lead to an improved outcome