Download presentation
Presentation is loading. Please wait.
Published byBenedict Kory Blake Modified over 8 years ago
1
Oil and Gas Production 1 PRO 250 PowerPoint presentation created by Dr. Shauna Kocman used in CMC PRO250 with her permission under Creative Commons License 3
2
Overview History and Market Geology Reservoir Fluids Regulation EHS Drilling Completions Production Processing Maintenance and Workovers
3
Oil and Gas Development
5
Cretaceous Interior Seaway Geology
7
http://www.garfield-county.com/oil-gas/documents/energy-advisory-board/EAB-March- 2012-CGS-Peter-Barkmann-Geology-of-Piceance-Basin.pdf Wasatch Formation (Fort Union Formation) Mesaverde Group Mancos Group (Pierre Shale to the east) Niobrara Formation
8
Exploration Geophysical - Seismic
9
Reservoir Fluids
10
Regulation and Mineral Ownership
11
Environmental Health and Safety
12
Drilling the well Once the pad is constructed, the drilling rig is rigged up (set up) and drilling commences. The lower picture is of an offshore production platform.
13
Directional Drilling Multi-well locations Reduced well pad density Reduced road density Dual rig operations 13
14
Drilling rig components
15
Drilling Wells may be drilled, vertically, directionally, or horizontally. Directional Drilling The drilling rig rotates the drillpipe, allowing the bit to rotate at the bottom of the hole so that rock can be cut. The drillpipe flexes with the wellbore angle. The steel is flexible! Drillpipe Bit
16
Casing and Cementing Surface casing is set to: protect fresh water zones, prevent lost circulation, and for well control. Production casing is typically set through the productive zones and may be used as a hydrocarbon conduit to surface. Both strings are cemented to prevent fluid migration and isolate producing intervals.
17
Perforating Open up the hydrocarbon bearing zone. A perforating gun is used to perforate the production casing.
18
Hydraulic Fracturing Hydraulic fracturing is needed to open up more flow conduits to the perforation holes. A proppant, normally sand, remains in the fractures to keep them propped open, increasing permeability. Flowback
19
>99% of a frac mixture consists of sand and water. Frac Fluid Components
20
Water Delivery Systems Temporary, poly water pipelines Delivers water for drilling and completions Eliminates water truck traffic and impacts 20
21
Production Equipment 21
22
Wellhead
23
Tanks 23
24
Processing: Separation, Dehydration, Compression
25
Maintenance and Workovers
26
Who is involved?
27
Lets head outside to get to know the equipment You will be choosing 1 piece of equipment for project 1. Get to know it! Share what you know!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.