Presentation is loading. Please wait.

TGC online DQ GNAM + RODSampler status 11/09/2009 GNAMs + ROD sampler: 6/6 GNAM segments running. 1 RODSampler application running. 1/6 GNAM segment (efficiencies.

Similar presentations


Presentation on theme: "TGC online DQ GNAM + RODSampler status 11/09/2009 GNAMs + ROD sampler: 6/6 GNAM segments running. 1 RODSampler application running. 1/6 GNAM segment (efficiencies."— Presentation transcript:

1 TGC online DQ GNAM + RODSampler status 11/09/2009 GNAMs + ROD sampler: 6/6 GNAM segments running. 1 RODSampler application running. 1/6 GNAM segment (efficiencies analysis) runs but has a memory leak. If not solved until 22/09, then this segment will be excluded from the combined run. Probably, the memory-consuming segment caused the sampling rates to be low at the last combined run Need to prepare at least 1 more complex GNAM segment (not for the next combined run). 2/6 GNAMs (pT thresholds & trigger profiles) were running but had no decoded output until these days. Hence, their output will be tested during the next combined run.

2 DQMFs + OHP + DB: DQMF1: 4/4 DQMF segments running. DQMF2: Algorithms parameters not tuned. Thus, although some of the DQRegions are green, the overall status is red. DQMF3: Need to prepare 2 new segments for the Efficiency and the Timing Adjustment GNAMs (not for the next run). OHP: A collection of the SHIFT histograms are monitored also by OHPNexus (have to move the xml files to the centralconf area). DB1: A mechanism to write online DQ results (chambers status, timing etc.) has been implemented. It registers the results into a set of arrays that are published in the TGC IS server. The update frequency is currently identical to the DQMF pull frequency. DB2: In preparation – new tools to (1) view these arrays and (2) propagate the results on to the TGC oracle DB and then to cool. TGC online DQ DQMF + OHP + DB status 11/09/2009

3 Near future PLANS: Focus in the existing modules, and make sure that they are ready without problems  due date is 21/09. Internal DQ discussion: tuning and adjusting based on the run data. Documentation: make a new draft of the shifter manual and update the Twiki page. OHP plugin: need to develop a simple ohp nexus plugin for the Timing Adjustment histograms. Who is the person in charge of OHP ? TGC online DQ plans for the 22/09 combined run

4 misc: Manpower: was increased by +=2. Special attention: on documentation and propagating the DQ data to DB. TGC online DQ miscellaneous