Download presentation
Presentation is loading. Please wait.
Published byLeslie McKenzie Modified over 8 years ago
2
Proposal for Completely Green Technology For the Dominican Republic
3
Projects We Have Completed Dhaka Bangladesh Zhengzhou, China Yatai, China Shaolin, China Hebei, China Sindh, Pakistan Wasit, Iraq Falluja, Iraq Mindanao, Philippines Dalian, China Lanzhou, China
4
Proposal for the Design, Manufacture, Installation, & Operation of viable WASTE TO ENERGY solutions: 300 MW Green Plant Rendering of plant
5
Circulating Fluidized Bed is approved By the USA EPA and the California EPA Approved around the world for being Clean Safe for the environment. Can supply abundance of energy Can use almost anything that burns as a fuel Help eliminate land fills Can eliminate Municipal and industrail waste
6
Watch Video to Explain Fluidized Bed Technology Double click to play the video above
7
100% Green Technology Circulating Fluidized Bed Technology
8
What Can Make Energy Coal is used when no other waste is available Coal Wood chips Municipal Solid Waste Used Motor Oil Bio Mass Bagasse Used Tires Rubber Wastes These will be handled on a few days a month by trained employees Medical Waste Sewage Sludge Contaminated Soil Burnable Hazardous Wastes Pesticide Waste Chemical Waste Pathological Waste Almost any Burnable Substance that is not clean
9
Using Coal will Maintain a constant energy output Just Using coal our product would be 300 MW 1,000 tons of mixed MSW per day would lower our output to 280 MW 1,500 tons of mixed MSW per day would lower our output to 265 MW 2,000 tons of mixed MSW per day would lower our output to 250 MW 2,500 tons of mixed MSW per day would lower our output to 225 MW
10
Municipal Waste Will Be Our Main Energy Source from around the county
11
More Coal Will Be Used When We Do Not Have Enough Waste
12
Using Coal We will have a stock pile of coal to use and add to the waste to keep the heat an the boler working. This will give the country a constant supply of energy. The main fuel will be MSW For distant waste collections areas, if they turn the waste into RDF which easy to transport and clean.
14
Big saving on the cost of energy for the people of the Dominican Republic Waste is a natural commodity Saves the environment by being using waste Cost of MSW is cheaper than coal per KW No big transportation cost Clean and remove the existing garbage depositories will be developed in the future When coal is being used, the amount will be from 30% to 75% less then a normal coal fired plant Can use any grade of coal because of the clean emissions Cheaper shipping cost We can even own our Coal mine, if needed
15
Where we will buy the coal Venezuela Columbia Brazil USA Ports in Africa Canada Central America Mexico
16
What we will supply EXIM Bank Financing For 8 To 12 Years Build the plant in 24 to 30 months Use one of the best engineering companies to give the preliminary drawing Operate and maintain the plant as long as you want. Train Dominicans to operate the plant completely in 3 to 7 years Employ from 300 to 1,000 local workers
17
Dominican Republic
21
Free Day Care for all Employees Children
22
Buchang and the Joint Venture Group plant far exceeds air quality standards implemented by the US Environmental Protection Agency. We have raised the bar for excellence, and are confident that our products and services will exceed expectations. Dominican Republic Environmental Protection Agency
23
Basic skills training in Spanish and English literacy training if necessary Management development training Best practices approach to managing employees and facilities Secondary Benefits: Training and Skill Development
24
Free Clinic for Employees and Family open 3 day a week
25
Free Hot Lunches for all Employees all 3 Shifts
26
10 to 30 Homes a Year Built for Entry Level Employees
27
Good Purified Drinking Water for Employees (only made from Excess Heat) available to the local community
28
What the Dominican Republic Will Need to get Started Feasibility Study Land allocation (250 Acres) Environmental study Financial Pro-forma Impact study on the Electrical Grid Power Purchase Agreement for 25 Years County Guarantee
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.